How to Evaluate Data Center Colocation: A Buyer’s Guide

What Is Colocation?

Colocation (often abbreviated “colo”) is the practice of housing your servers, networking equipment, and storage hardware in a third-party data center facility. Instead of building and maintaining your own data center, a capital-intensive proposition that can cost $10M+ for even a modest facility, you rent space, power, and cooling from a colocation provider.

Enterprise buyers choose colocation for several reasons: predictable monthly costs, access to carrier-neutral connectivity, physical security, and the ability to scale capacity without building new facilities.

Key Evaluation Criteria

When comparing colocation facilities, focus on these critical factors:

Tier Rating

The Uptime Institute’s tier classification system rates data centers from Tier 1 (basic) to Tier 4 (fault tolerant):

  • Tier I: Basic capacity.
  • Tier II: Redundant capacity components.
  • Tier III: Concurrently maintainable infrastructure.
  • Tier IV: Fault-tolerant infrastructure.

These classifications do not assign guaranteed uptime percentages or annual downtime allowances. Review the operator’s separate service agreement and operational history. Uptime Institute explains the distinction.

Select the resilience level for your application’s recovery requirements, maintenance needs and architecture. Confirm the exact certification scope and the site’s operating record.

Power Capacity

Power is measured in kilowatts (kW) per rack or cabinet. Standard enterprise deployments use 6-8 kW per rack, while high-density and AI workloads may require 20-50+ kW per rack.

Check the measurement period and scope of each published PUE value with the operator; a directory entry alone does not establish a comparable portfolio-wide average.

Key power questions to ask:

  • What is the maximum kW per rack available?
  • Is metered or circuit-based power billing used?
  • What redundancy level is provided (N, N+1, 2N)?
  • Is on-site generation (diesel/gas) available for grid outages?

PUE (Power Usage Effectiveness)

PUE measures how efficiently a data center uses energy. A PUE of 1.0 would mean 100% of energy goes to computing equipment. In practice:

  • PUE 1.2-1.4: Good efficiency (modern facilities)
  • PUE 1.4-1.6: Average
  • PUE 1.6+: Below average, often older facilities

Lower PUE translates directly to lower operating costs, as less energy is wasted on cooling and overhead.

AI and High-Density Considerations

If you’re planning to deploy GPU workloads for AI training, inference, or high-performance computing, evaluate these additional factors:

  • Liquid cooling support: Direct liquid cooling (DLC) or rear-door heat exchangers for 30+ kW/rack densities
  • Power density: Ensure the facility can deliver the kW per rack your GPU clusters require
  • Network fabric: Low-latency interconnects between racks and rows for distributed training
  • GPU hosting experience: Ask the provider about their track record with GPU deployments

Certifications and Compliance

Depending on your industry, you may need facilities with specific certifications:

  • SOC 2 Type II: Standard for service organizations, covers security, availability, and confidentiality
  • ISO 27001: International information security management standard
  • HIPAA: Required for healthcare data (look for HIPAA-compliant facilities with BAA availability)
  • PCI DSS: Required for payment card data processing
  • FedRAMP: Required for federal government workloads

How to Request and Compare Quotes

The colocation procurement process typically follows these steps:

  1. Define requirements: Power (kW), space (cabinets/cages), connectivity, compliance needs
  2. Shortlist facilities: Use a directory like Godatacenters to filter by location, tier, and capabilities
  3. Request quotes: Submit RFQs to 3-5 providers for competitive pricing
  4. Evaluate proposals: Compare on total cost of ownership, not just rack rate
  5. Site visit: Tour your top 2-3 facilities before signing
  6. Negotiate terms: Contract length, power escalation clauses, SLA terms

Ready to start your search? Browse facilities or request a custom quote to get personalized recommendations from our advisory team.

← All insightsBack to top ↑

Keep exploring

All insights →

FROM RESEARCH TO REQUIREMENTS

Your next location starts here.

Search the global directory by location and power, or build a brief with our concierge team.

Search sites ↗Build your brief →