Salt Lake City is a Tier 2 US data center market in UT on the WECC grid. Colocation inventory is about 157 MW (JLL Midyear 2025 (colocation); Kem C. Gardner-style Utah fact sheet Apr 2026: ‘Utah hosts 48 operational data centers with over 920 MW’ statewide incl. hyperscale/NSA (H1 2025)). Vacancy is 3% (JLL Midyear 2025 (H1 2025)). Typical colocation pricing runs $150-210/kW/month for 1-5 MW (JLL H1 2025). GoDataCenters tracks 33 facilities from 11 operators in the metro.
Salt Lake City data center market at a glance
| Metric | Value | Source |
|---|---|---|
| Operational colocation inventory | 157 MW | JLL Midyear 2025 (colocation); Kem C. Gardner-style Utah fact sheet Apr 2026: ‘Utah hosts 48 operational data centers with over 920 MW’ statewide incl. hyperscale/NSA (H1 2025) |
| Under construction | 228 MW | JLL Midyear 2025 (colocation); Utah fact sheet Apr 2026: ~2,600 MW under construction statewide (H1 2025) |
| Planned pipeline | 885 MW | JLL Midyear 2025 (H1 2025) |
| Vacancy | 3% | JLL Midyear 2025 (H1 2025) |
| Typical pricing (kW/month) | $150-210/kW/month for 1-5 MW (JLL H1 2025) | |
| Grid operator | WECC (non-RTO; PacifiCorp East balancing authority) | |
| Power utility | Rocky Mountain Power (PacifiCorp) | |
| Power cost note | Salt Lake City 5.7 cents/kWh (JLL Midyear 2025) | |
| Facilities tracked by GoDataCenters | 33 | GoDataCenters facility database |
How available is power for data centers in Salt Lake City?
Utah 2025 policy allowed large energy users to negotiate directly with suppliers (DMA); ~1,700 MW of the state’s under-construction capacity is behind-the-meter/off-grid (Utah fact sheet Apr 2026).
Power is served by Rocky Mountain Power (PacifiCorp). Grid operator: WECC (non-RTO; PacifiCorp East balancing authority).
Who are the major data center operators in Salt Lake City?
Major operators active in the market: Meta (Eagle Mountain), Aligned (SLC-01..), Novva, Flexential, DataBank, Cirrus Data Services, QTS (Eagle Mountain), NSA Utah Data Center, Google (planned).
| Operator | Facilities in metro (GoDataCenters DB) |
|---|---|
| DataBank | 6 |
| Flexential | 5 |
| Cirrus Data Services | 4 |
| Aligned Data Centers | 3 |
| Oracle | 2 |
| EdgeConneX | 1 |
| Novva | 1 |
| Fibernet Corp | 1 |
| BluSky AI | 1 |
| Voonami Inc | 1 |
Facility concentration by city: Salt Lake City (30), Orem (3).
Browse Salt Lake City data centers in the GoDataCenters directory
What does colocation cost in Salt Lake City?
Typical pricing bands: $150-210/kW/month for 1-5 MW (JLL H1 2025). Bands are brokerage-reported ranges for the market, not quotes. Actual rates depend on power density, term, ramp and redundancy.
Fiber and carrier presence in Salt Lake City
Strong fiber connectivity to Silicon Valley and Denver (DC Byte).
What tax incentives apply to data centers in UT?
| Item | Detail |
|---|---|
| State sales/use tax exemption | yes |
| Program | Utah S.B. 114 (2020) qualifying data center sales tax exemption |
| Threshold | Facilities >=150,000 sq ft and their occupants: sales tax exemption on qualifying machinery and equipment |
| Note | Utah expanded tax exemptions for data center equipment in 2025 (DMA). |
Salt Lake City colocation by capacity band
- 1-5 MW colocation in Salt Lake City
- 5-20 MW colocation in Salt Lake City
- 20 MW+ colocation in Salt Lake City
Frequently asked questions
How much data center capacity is in Salt Lake City?
About 157 MW of operational colocation inventory per JLL Midyear 2025 (colocation); Kem C. Gardner-style Utah fact sheet Apr 2026: ‘Utah hosts 48 operational data centers with over 920 MW’ statewide incl. hyperscale/NSA (H1 2025). A further 228 MW is under construction.
What is the data center vacancy rate in Salt Lake City?
3% per JLL Midyear 2025 (H1 2025).
What is the typical colocation price per kW in Salt Lake City?
$150-210/kW/month for 1-5 MW (JLL H1 2025).
Which grid serves Salt Lake City data centers?
WECC (non-RTO; PacifiCorp East balancing authority). Utility: Rocky Mountain Power (PacifiCorp).
Does UT offer a data center sales tax exemption?
yes. Program: Utah S.B. 114 (2020) qualifying data center sales tax exemption. Threshold: Facilities >=150,000 sq ft and their occupants: sales tax exemption on qualifying machinery and equipment.
Is Salt Lake City a Tier 1, Tier 2 or Tier 3 data center market?
Salt Lake City is classified as a Tier 2 market, using the CBRE, JLL and Cushman & Wakefield market tracking conventions.
Need capacity in Salt Lake City?
Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.
Operate a facility here?
List it on GoDataCenters to reach buyers searching this market.
Sources
- https://realestatedaily-news.com/wp-content/uploads/2025/08/JLL-North-America-Data-Center-Report-Midyear-2025-8.14.25.pdf
- https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf
- https://baxtel.com/data-center/salt-lake-city
- https://www.dcbyte.com/market/salt-lake-city/
- https://dmainc.com/news-and-insights/state-rules-data-center-incentives-2025/
Data compiled by GoDataCenters. Last updated 2026-10-15. Figures are market-level ranges from cited reports, not quotes.