5-20 MW Colocation in Salt Lake City

5-20 MW colocation in Salt Lake City: pricing $150-210/kW/month for 1-5 MW, vacancy 3%, operators, power lead times and what to put in the RFP.

5-20 MW requirements in Salt Lake City fall into the wholesale colocation segment. Market pricing bands: $150-210/kW/month for 1-5 MW (JLL H1 2025) (brokerage data). Market vacancy is 3%, so 5-20 MW blocks are available but competitive. Total operational inventory is about 157 MW.

5-20 MW colocation in Salt Lake City: key numbers

Metric Value Source
Pricing band (market) $150-210/kW/month for 1-5 MW (JLL H1 2025)
Vacancy 3% JLL Midyear 2025 (H1 2025)
Inventory 157 MW JLL Midyear 2025 (colocation); Kem C. Gardner-style Utah fact sheet Apr 2026: ‘Utah hosts 48 operational data centers with over 920 MW’ statewide incl. hyperscale/NSA (H1 2025)
Under construction 228 MW JLL Midyear 2025 (colocation); Utah fact sheet Apr 2026: ~2,600 MW under construction statewide (H1 2025)
Grid WECC (non-RTO; PacifiCorp East balancing authority)

Can Salt Lake City deliver 5-20 MW of power today?

Utah 2025 policy allowed large energy users to negotiate directly with suppliers (DMA); ~1,700 MW of the state’s under-construction capacity is behind-the-meter/off-grid (Utah fact sheet Apr 2026).

Which operators can serve 5-20 MW in Salt Lake City?

Operators active in the market at scale include Meta (Eagle Mountain), Aligned (SLC-01..), Novva, Flexential, DataBank, Cirrus Data Services, QTS (Eagle Mountain), NSA Utah Data Center, Google (planned). Availability for a specific block changes monthly; request a capacity check for current options.

Browse Salt Lake City facilities for a 5-20 MW requirement

What to specify in a 5-20 MW RFP

State IT load in MW and the ramp schedule, target density in kW per rack, redundancy (N+1 or 2N), term, take-or-pay and ramp terms, and whether you need liquid cooling. Our colocation RFQ guide sets out the full template.

Frequently asked questions

What does 5-20 MW colocation cost in Salt Lake City?

Market pricing bands are $150-210/kW/month for 1-5 MW (JLL H1 2025). Larger blocks and longer terms price toward the low end.

Is 5-20 MW capacity available in Salt Lake City right now?

Market vacancy is 3%. Some blocks are available; timing and density drive the shortlist.

Is Salt Lake City a good market for a 5-20 MW deployment?

Salt Lake City is a Tier 2 market with about 157 MW of inventory. Fit depends on power lead time, latency needs and incentive eligibility.

Related pages

Need capacity in Salt Lake City?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Sources

Data compiled by GoDataCenters. Last updated 2026-10-15. Figures are market-level ranges from cited reports, not quotes.