5-20 MW Colocation in Los Angeles

5-20 MW colocation in Los Angeles: pricing $125-145/kW/month for 1-5 MW, vacancy 14%, operators, power lead times and what to put in the RFP.

5-20 MW requirements in Los Angeles fall into the wholesale colocation segment. Market pricing bands: $125-145/kW/month for 1-5 MW (JLL H1 2025, Southern California) (brokerage data). Market vacancy is 14%, so 5-20 MW blocks are available in multiple facilities. Total operational inventory is about 355 MW.

5-20 MW colocation in Los Angeles: key numbers

Metric Value Source
Pricing band (market) $125-145/kW/month for 1-5 MW (JLL H1 2025, Southern California)
Vacancy 14% JLL Midyear 2025 Southern California (14%); CBRE 2022: 18.3% (H1 2025)
Inventory 355 MW JLL Midyear 2025 ‘Southern California’ (H1 2025)
Under construction 100 MW JLL Midyear 2025 Southern California (H1 2025)
Grid CAISO (SCE); LADWP is its own balancing authority

Can Los Angeles deliver 5-20 MW of power today?

Pricing increasing due to reduced vacancy; AI/hyperscale demand attracting new developers; One Wilshire marketing 10+ MW shell capacity (CBRE H1 2025). Monterey Park voter-approved citywide data center ban (June 2026).

Which operators can serve 5-20 MW in Los Angeles?

Operators active in the market at scale include Digital Realty (One Wilshire), CoreSite (LA1/LA2/LA3), Prime Data Centers (Vernon), Evocative, Equinix, DataBank, Goodman, Cyxtera/Centersquare. Availability for a specific block changes monthly; request a capacity check for current options.

What to specify in a 5-20 MW RFP

State IT load in MW and the ramp schedule, target density in kW per rack, redundancy (N+1 or 2N), term, and whether you need liquid cooling. See colocation RFP questions to ask and take-or-pay.

Frequently asked questions

What does 5-20 MW colocation cost in Los Angeles?

Market pricing bands are $125-145/kW/month for 1-5 MW (JLL H1 2025, Southern California). Larger blocks and longer terms price toward the low end.

Is 5-20 MW capacity available in Los Angeles right now?

Market vacancy is 14%. Some blocks are available; timing and density drive the shortlist.

Is Los Angeles a good market for a 5-20 MW deployment?

Los Angeles is a Tier 2 market with about 355 MW of inventory. Fit depends on power lead time, latency needs and incentive eligibility.

Related pages

Need capacity in Los Angeles?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Sources

Data compiled by GoDataCenters. Last updated 2026-09-02. Figures are market-level ranges from cited reports, not quotes.