Find colocation capacity for your next deploymentGet a Quote

Project Tallmadge - Building 1

Takanock, LLC · Borden Mowery Dr, Strasburg, Virginia

Operator verified

Get a Quote

Tier
Tier 3
PUE
1.43
AI score
20/100

About this facility

Project Tallmadge - Building 1 is a colocation data center in Strasburg, Virginia operated by Takanock, LLC. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 3 facilities tracked in Strasburg, so it can be compared side by side with the rest of that market.

Retail colocation; Wholesale; Private cages; Suites; Build-to-suit; Managed services; Remote hands | Sustainability: 100% carbon-free electricity for operations; water-free cooling (WUE=0 new sites); tree replacement program; renewable PPAs; ENERGY STAR; GRESB leader | Fiber: Verizon; Level 3; Windstream; Comcast; Telia Carrier; Zayo; Lumen | LEED: Yes (designed to LEED standards) | Fire Suppression: VESDA; pre-action dry pipe

  • N+1 Redundancy
  • 2N Redundancy
  • Carrier Neutral
  • On-site Security
  • Remote Hands
  • Meet-Me Room

Facility specifications

Operator
Takanock, LLC
Tier
Tier 3
Cooling
hybrid
PUE
1.43
Year built
2020
Renewable energy
0%
AI readiness score
20 / 100

Cloud on-ramps

  • AWS Direct Connect
  • Azure ExpressRoute (inferred from deployments)

Certifications and compliance

  • SOC 1
  • SOC 2
  • ISO 27001
  • ISO 22301
  • PCI DSS
  • HITRUST
  • FISMA High
  • LEED
  • ENERGY STAR
  • SSAE 16

Location

Borden Mowery Dr, Strasburg, Virginia · Open in Google Maps

Common questions

Who operates Project Tallmadge - Building 1?

Project Tallmadge - Building 1 in Strasburg, Virginia is operated by Takanock, LLC.

What tier is Project Tallmadge - Building 1?

Project Tallmadge - Building 1 is rated Tier 3.

Is Project Tallmadge - Building 1 AI-ready?

Project Tallmadge - Building 1 is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.

What other data centers are near Project Tallmadge - Building 1?

3 facilities are tracked in Strasburg. The closest listed here are Project Tallmadge, Project Tallmadge - Building 2 and 10051 Brickyard Wy.

How do I get a quote for Project Tallmadge - Building 1?

Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Project Tallmadge - Building 1 and comparable facilities.

Request capacity at Project Tallmadge - Building 1

One requirement, matched against this facility and every alternative in the market.

Get a quote