Find colocation capacity for your next deploymentGet a Quote

Aptum Herndon

Aptum · 2350 Corporate Park Dr, Herndon, Virginia

Operator verified

Get a Quote

Tier
Tier 3
PUE
1.40
AI score
22/100

About this facility

Aptum Herndon is a colocation data center in Herndon, Virginia operated by Aptum. The facility is rated Tier 3, was built in 2020 and uses air cooling. It is one of 8 facilities tracked in Herndon, so it can be compared side by side with the rest of that market.

Retail colocation; Cabinets; Cages; Suites; Rooftop colocation; Field Tech Services; Managed services; Remote hands | Sustainability: Scope 1&2 emissions reduction 55% by 2033 (2022 base); Scope 3 33% by 2033; renewable energy procurement; energy efficiency | Fiber: Lumen; diverse carriers; AT&T; Verizon; others | Min Contract: Varies; Initial term per service order, then month-to-month | LEED: No | Fire Suppression: Double interlock dry-pipe pre-action; VESDA; dual zoned smoke/ion detection

  • N+1 Redundancy
  • 2N Redundancy
  • Carrier Neutral
  • On-site Security
  • Remote Hands
  • Meet-Me Room

Facility specifications

Operator
Aptum
Tier
Tier 3
Cooling
air
PUE
1.40
Year built
2020
Renewable energy
0%
AI readiness score
22 / 100

Cloud on-ramps

  • AWS Direct Connect

Certifications and compliance

  • SOC 1
  • SOC 2
  • ISO 27001
  • HIPAA
  • PCI DSS
  • SSAE 18

Location

2350 Corporate Park Dr, Herndon, Virginia · Open in Google Maps

Common questions

Who operates Aptum Herndon?

Aptum Herndon in Herndon, Virginia is operated by Aptum.

What tier is Aptum Herndon?

Aptum Herndon is rated Tier 3.

Is Aptum Herndon AI-ready?

Aptum Herndon is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.

What other data centers are near Aptum Herndon?

8 facilities are tracked in Herndon. The closest listed here are 365 Data Centers - Herndon, Cogent Data Center - Herndon and H5 Data Centers Herndon.

How do I get a quote for Aptum Herndon?

Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Aptum Herndon and comparable facilities.

Request capacity at Aptum Herndon

One requirement, matched against this facility and every alternative in the market.

Get a quote