FACILITY DIRECTORY
Project Turbo, LLC ↗Project Turbo
2400 O'Kelly Road, Gainesville, GA 30507, Gainesville, Georgia, United States
Availability to confirmRecord under reviewA clearer view of this location.
Project Turbo is a directory record in Gainesville. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Project Turbo, LLC
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
2400 O'Kelly Road, Gainesville, GA 30507, Gainesville, Georgia, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 21, 2026
- Source record updated
- May 4, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Reviewed 20 October 2026. Hall County minutes item 32 approve withdrawal of the Project Turbo LLC data-center special-use application for 119± acres of parcel 15024 000003A (part), 3–0, on 11 December 2025. Item 31 separately approves Light Industrial rezoning, 3–1. The March 2026 amendment concerns item 33, not these decisions. The application withdrawal is not treated as withdrawal of the project itself: the December 2025 staff report, page 10, states that a data center required Board special-use approval, including on I-1 sites. Accordingly the I-1 rezoning is not treated here as approval for the data-center use. Later land-use rules or renewed applications remain unverified. No permanent abandonment is inferred. The July 2025 applicant narrative gives Gainesville, Georgia 30507; its conceptual plan explicitly labels Buildings A/B/C. The imported Virginia location and operating-facility defaults are unsupported. Remove their map points and Tier/PUE/year defaults, plus the campus density/cooling defaults. Do not transfer the applicant’s future design-power, floor-area or cooling claims into operational fields. No later approved project or operating capacity was verified. Follow-up: exact applicant address2400OkellyRoadGainesvilleGA30507 returns ArcGIS100PointAddress34.224374454573,-83.78058907752. Restore solely as approximate shared proposal-address reference; inherited Virginia point is not restored. Special-use withdrawal and unresolved current development approvals remain explicit; map does not certify an operating facility or current approval. Conceptual A/B/C labels have no verified individual building coordinates.
- Hall County 11 December 2025 minutes, items 31–32: industrial rezoning approved separately from special-use withdrawal ↗
- Project Turbo applicant narrative: exact Gainesville GA address and parcel; future design only ↗
- Project Turbo conceptual site plan: Buildings A, B and C, same applicant and tract ↗
- Hall County December 2025 special-use staff report, page 10: data-center use requires Board special-use approval ↗
- Exact county-applicant proposed-site address score100PointAddress; proposal reference only ↗