Reach Data Center Decision MakersAdvertise

PowerHouse 95 - Building 4

PowerHouse Data Centers · Overview Dr & Cosner Dr, Fredericksburg, Virginia

Operator verified

Get a Quote

Tier
Tier 3
PUE
1.40
AI score
47/100

About this facility

PowerHouse 95 - Building 4 is a colocation data center in Fredericksburg, Virginia operated by PowerHouse Data Centers. The facility is rated Tier 3, was built in 2020 and uses liquid cooling. It is one of 26 facilities tracked in Fredericksburg, so it can be compared side by side with the rest of that market.

Powered shells; build-to-suit; turnkey hyperscale campuses; private suites | Sustainability: iMasons Climate Accord; water reduction; waste mgmt; tree conservation/reforestation; EV charging; sustainable practices | Fiber: Dense carrier networks; dark fiber providers | Min Contract: Long-term (e.g., 30-year leases) | LEED: Targeting LEED BD+C (Arcola)

  • Carrier Neutral
  • On-site Security

Facility specifications

Operator
PowerHouse Data Centers
Tier
Tier 3
Cooling
liquid
PUE
1.40
Year built
2020
Renewable energy
0%
AI readiness score
47 / 100

Cloud on-ramps

  • AWS
  • Azure

Certifications and compliance

  • Targeting LEED BD+C

Location

Overview Dr & Cosner Dr, Fredericksburg, Virginia · Open in Google Maps

Common questions

Who operates PowerHouse 95 - Building 4?

PowerHouse 95 - Building 4 in Fredericksburg, Virginia is operated by PowerHouse Data Centers.

What tier is PowerHouse 95 - Building 4?

PowerHouse 95 - Building 4 is rated Tier 3.

Is PowerHouse 95 - Building 4 AI-ready?

PowerHouse 95 - Building 4 is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.

What other data centers are near PowerHouse 95 - Building 4?

26 facilities are tracked in Fredericksburg. The closest listed here are PowerHouse 95 - Building 1, PowerHouse 95 - Building 2 and PowerHouse 95 - Building 3.

How do I get a quote for PowerHouse 95 - Building 4?

Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for PowerHouse 95 - Building 4 and comparable facilities.

Request capacity at PowerHouse 95 - Building 4

One requirement, matched against this facility and every alternative in the market.

Get a quote