Equinix CU4
Equinix · 18155 Technology Drive, Culpeper, Virginia
Operator verified
- Tier
- Tier 3
- PUE
- 1.39
- AI score
- 25/100
About this facility
Equinix CU4 is a colocation data center in Culpeper, Virginia operated by Equinix. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 15 facilities tracked in Culpeper, so it can be compared side by side with the rest of that market.
Retail colocation; Private cages/suites; Partial/full cabinets; Managed services; Build-to-suit; Remote hands/Smart Hands | Sustainability: 96% renewable energy (2024); 100% clean energy goal by 2030; 1.2 GW PPAs; Heat export 14.5 GWh; $51M energy efficiency investment | Fiber: 200+ carriers and networks | LEED: Yes (Silver, Gold at various facilities) | Fire Suppression: Pre-action double interlock dry pipe sprinkler; High-pressure water mist; VESDA
- N+1 Redundancy
- 2N Redundancy
- Carrier Neutral
- On-site Security
- Remote Hands
- Meet-Me Room
Facility specifications
- Operator
- Equinix
- Tier
- Tier 3
- Cooling
- hybrid
- PUE
- 1.39
- Year built
- 2020
- Renewable energy
- 0%
- AI readiness score
- 25 / 100
Cloud on-ramps
- AWS Direct Connect
- Microsoft Azure ExpressRoute
- Google Cloud
- Oracle
Certifications and compliance
- SOC 2
- ISO 27001
- ISO 22301
- HIPAA
- PCI DSS
- FISMA/NIST
- CSA
- LEED
- Energy Star
- ISO 50001
Location
18155 Technology Drive, Culpeper, Virginia · Open in Google Maps
Common questions
Who operates Equinix CU4?
Equinix CU4 in Culpeper, Virginia is operated by Equinix.
What tier is Equinix CU4?
Equinix CU4 is rated Tier 3.
Is Equinix CU4 AI-ready?
Equinix CU4 is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.
What other data centers are near Equinix CU4?
15 facilities are tracked in Culpeper. The closest listed here are CloudHQ CLP Campus, CloudHQ CLP1 and CloudHQ CLP2.
How do I get a quote for Equinix CU4?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Equinix CU4 and comparable facilities.
Request capacity at Equinix CU4
One requirement, matched against this facility and every alternative in the market.