Find colocation capacity for your next deploymentGet a Quote

Pixel Factory Data Center

Pixel Factory Data Center · 9680 Atlee Commons Dr., Ashland, Virginia

Operator verified

Get a Quote

Tier
Tier 3
PUE
1.43
AI score
20/100

About this facility

Pixel Factory Data Center is a colocation data center in Ashland, Virginia operated by Pixel Factory Data Center. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 2 facilities tracked in Ashland, so it can be compared side by side with the rest of that market.

Retail colocation; Wholesale; Private cages; Suites; Build-to-suit; Managed services; Remote hands | Sustainability: 100% carbon-free electricity for operations; water-free cooling (WUE=0 new sites); tree replacement program; renewable PPAs; ENERGY STAR; GRESB leader | Fiber: Verizon; Level 3; Windstream; Comcast; Telia Carrier; Zayo; Lumen | LEED: Yes (designed to LEED standards) | Fire Suppression: VESDA; pre-action dry pipe

  • N+1 Redundancy
  • 2N Redundancy
  • Carrier Neutral
  • On-site Security
  • Remote Hands
  • Meet-Me Room

Facility specifications

Operator
Pixel Factory Data Center
Tier
Tier 3
Cooling
hybrid
PUE
1.43
Year built
2020
Renewable energy
0%
AI readiness score
20 / 100

Cloud on-ramps

  • AWS Direct Connect
  • Azure ExpressRoute (inferred from deployments)

Certifications and compliance

  • SOC 1
  • SOC 2
  • ISO 27001
  • ISO 22301
  • PCI DSS
  • HITRUST
  • FISMA High
  • LEED
  • ENERGY STAR
  • SSAE 16

Location

9680 Atlee Commons Dr., Ashland, Virginia · Open in Google Maps

Common questions

Who operates Pixel Factory Data Center?

Pixel Factory Data Center in Ashland, Virginia is operated by Pixel Factory Data Center.

What tier is Pixel Factory Data Center?

Pixel Factory Data Center is rated Tier 3.

Is Pixel Factory Data Center AI-ready?

Pixel Factory Data Center is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.

What other data centers are near Pixel Factory Data Center?

2 facilities are tracked in Ashland. The closest listed here are Hanover Technology Park, 10051 Brickyard Wy and 1780 Business Center Drive (VA3).

How do I get a quote for Pixel Factory Data Center?

Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Pixel Factory Data Center and comparable facilities.

Request capacity at Pixel Factory Data Center

One requirement, matched against this facility and every alternative in the market.

Get a quote