Bexar Datacenter
Bexar Datacenter · 3463 Magic Drive, San Antonio, Texas
Operator verified
- Tier
- Tier 3
- PUE
- 1.27
- AI score
- 15/100
About this facility
Bexar Datacenter is a colocation data center in San Antonio, Texas operated by Bexar Datacenter. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 34 facilities tracked in San Antonio, so it can be compared side by side with the rest of that market.
Retail colocation, hyperscale, build-to-suit, cages/cabinets, powered shells, interconnection, remote hands, HPC-capable, managed services via partners | Sustainability: Zero water consumption cooling; Net Positive Water; 100% Carbon-Free/Renewable Electricity (some); NWF Certified Wildlife Habitat; TRUE Zero Waste Gold; efficient chillers/CRAH/VFDs; climate neutral by 2030 goal | Fiber: Multiple carriers (carrier neutral); specific providers not listed on pages | Min Contract: Not publicly spec
- N+1 Redundancy
- 2N Redundancy
- Carrier Neutral
- On-site Security
- Remote Hands
- Meet-Me Room
Facility specifications
- Operator
- Bexar Datacenter
- Tier
- Tier 3
- Cooling
- hybrid
- PUE
- 1.27
- Year built
- 2020
- Renewable energy
- 0%
- AI readiness score
- 15 / 100
Certifications and compliance
- SSAE 16/18
- SOC 2 Type II
- ISO 27001
- PCI DSS
- HIPAA/HITECH
- FISMA
- HITRUST
- Green Globes (3)
- TRUE Zero Waste Gold
Location
3463 Magic Drive, San Antonio, Texas · Open in Google Maps
Common questions
Who operates Bexar Datacenter?
Bexar Datacenter in San Antonio, Texas is operated by Bexar Datacenter.
What tier is Bexar Datacenter?
Bexar Datacenter is rated Tier 3.
Is Bexar Datacenter AI-ready?
Bexar Datacenter is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.
What other data centers are near Bexar Datacenter?
34 facilities are tracked in San Antonio. The closest listed here are American Tower EDC San Antonio, Black Mountain San Antonio and CityNAP.
How do I get a quote for Bexar Datacenter?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Bexar Datacenter and comparable facilities.
Request capacity at Bexar Datacenter
One requirement, matched against this facility and every alternative in the market.

