Red Oak Campus
DataBank · Batchler Rd & Stainback Rd, Red Oak, Texas
Operator verified
- Tier
- Tier 3
- PUE
- 1.40
- AI score
- 25/100
About this facility
Red Oak Campus is a colocation data center in Red Oak, Texas operated by DataBank. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 7 facilities tracked in Red Oak, so it can be compared side by side with the rest of that market.
Colocation (suites, cages, private/partial cabinets, individual servers), wholesale, cloud, connectivity, managed services; high-density AI/HPC support | Sustainability: Net-zero Scope 1+2 by 2030, full value chain by 2040 (SBTi); 100% renewable/low-carbon energy by 2030; 51% renewable non-IT FY23; heat reuse, water reduction, AI-driven efficiency | Fiber: Carrier-neutral with diverse fiber entry points; access to telecom networks including own Tier 1 Global IP Network | LEED: Yes (e.g., Phoenix
- N+1 Redundancy
- 2N Redundancy
- Carrier Neutral
- On-site Security
- Remote Hands
- Meet-Me Room
Facility specifications
- Operator
- DataBank
- Tier
- Tier 3
- Cooling
- hybrid
- PUE
- 1.40
- Year built
- 2020
- Renewable energy
- 0%
- AI readiness score
- 25 / 100
Certifications and compliance
- SOC 1 Type II
- SOC 2 Type II
- ISO 27001
- PCI DSS
- NIST 800-53 High
- HIPAA
- facilities also Tier III/IV
- ISO 50001
- ANSI/TIA-942-C
Location
Batchler Rd & Stainback Rd, Red Oak, Texas · Open in Google Maps
Common questions
Who operates Red Oak Campus?
Red Oak Campus in Red Oak, Texas is operated by DataBank.
What tier is Red Oak Campus?
Red Oak Campus is rated Tier 3.
Is Red Oak Campus AI-ready?
Red Oak Campus is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.
What other data centers are near Red Oak Campus?
7 facilities are tracked in Red Oak. The closest listed here are DFW10 - Red Oak, DFW11 - Red Oak and DFW12 - Red Oak.
How do I get a quote for Red Oak Campus?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Red Oak Campus and comparable facilities.
Request capacity at Red Oak Campus
One requirement, matched against this facility and every alternative in the market.


