Find colocation capacity for your next deploymentGet a Quote

IRVING-TX

Cloudnium LLC · 6001 W Campus Circle, Irving, Texas

Operator verified

Get a Quote

Tier
Tier 3
PUE
1.27
AI score
15/100

About this facility

IRVING-TX is a colocation data center in Irving, Texas operated by Cloudnium LLC. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 15 facilities tracked in Irving, so it can be compared side by side with the rest of that market.

Retail colocation, hyperscale, build-to-suit, cages/cabinets, powered shells, interconnection, remote hands, HPC-capable, managed services via partners | Sustainability: Zero water consumption cooling; Net Positive Water; 100% Carbon-Free/Renewable Electricity (some); NWF Certified Wildlife Habitat; TRUE Zero Waste Gold; efficient chillers/CRAH/VFDs; climate neutral by 2030 goal | Fiber: Multiple carriers (carrier neutral); specific providers not listed on pages | Min Contract: Not publicly spec

  • N+1 Redundancy
  • 2N Redundancy
  • Carrier Neutral
  • On-site Security
  • Remote Hands
  • Meet-Me Room

Facility specifications

Operator
Cloudnium LLC
Tier
Tier 3
Cooling
hybrid
PUE
1.27
Year built
2020
Renewable energy
0%
AI readiness score
15 / 100

Certifications and compliance

  • SSAE 16/18
  • SOC 2 Type II
  • ISO 27001
  • PCI DSS
  • HIPAA/HITECH
  • FISMA
  • HITRUST
  • Green Globes (3)
  • TRUE Zero Waste Gold

Location

6001 W Campus Circle, Irving, Texas · Open in Google Maps

Common questions

Who operates IRVING-TX?

IRVING-TX in Irving, Texas is operated by Cloudnium LLC.

What tier is IRVING-TX?

IRVING-TX is rated Tier 3.

Is IRVING-TX AI-ready?

IRVING-TX is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.

What other data centers are near IRVING-TX?

15 facilities are tracked in Irving. The closest listed here are DA9, DFW01 Campus and DFW01-1.

How do I get a quote for IRVING-TX?

Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for IRVING-TX and comparable facilities.

Request capacity at IRVING-TX

One requirement, matched against this facility and every alternative in the market.

Get a quote