GDC - Dallas TX4
NTT DATA, Inc. · 2011 Lookout Drive, Garland, Texas
Operator verified
- Tier
- Tier 3
- PUE
- 1.40
- AI score
- 35/100
About this facility
GDC - Dallas TX4 is a colocation data center in Garland, Texas operated by NTT DATA, Inc.. The facility is rated Tier 3, was built in 2020 and uses hybrid cooling. It is one of 9 facilities tracked in Garland, so it can be compared side by side with the rest of that market.
Retail colocation (racks, cabinets, cages), wholesale, managed services, cloud/hybrid IT, bare metal, remote/smart hands, DRaaS | Sustainability: Net zero Scope 1/2 emissions by 2030; 20+ DCs powered by 100% renewables via RECs/green tariffs; demand response with batteries; energy-efficient practices | Fiber: Multiple Tier 1/2 carriers, dark fiber providers onsite at carrier hotels; 5+ carriers at some sites | Min Contract: Typically 36 months initial term (per sample MSA) | LEED: Pursues LEED c
- 2N Redundancy
- Carrier Neutral
- On-site Security
- Remote Hands
- Meet-Me Room
Facility specifications
- Operator
- NTT DATA, Inc.
- Tier
- Tier 3
- Cooling
- hybrid
- PUE
- 1.40
- Year built
- 2020
- Renewable energy
- 0%
- AI readiness score
- 35 / 100
Certifications and compliance
- SSAE 18 SOC 1/2
- PCI DSS
- HIPAA
- FedRAMP
- FISMA
- NIST SP800-53 R5
- StateRAMP
- GDPR
- EU-U.S. Data Privacy Framework
- ISO 27001 (some facilities)
Location
2011 Lookout Drive, Garland, Texas · Open in Google Maps
Common questions
Who operates GDC - Dallas TX4?
GDC - Dallas TX4 in Garland, Texas is operated by NTT DATA, Inc..
What tier is GDC - Dallas TX4?
GDC - Dallas TX4 is rated Tier 3.
Is GDC - Dallas TX4 AI-ready?
GDC - Dallas TX4 is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.
What other data centers are near GDC - Dallas TX4?
9 facilities are tracked in Garland. The closest listed here are 1502 Ferris Rd, 1505 Ferris Rd and 1702 W Campbell Rd.
How do I get a quote for GDC - Dallas TX4?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for GDC - Dallas TX4 and comparable facilities.
Request capacity at GDC - Dallas TX4
One requirement, matched against this facility and every alternative in the market.


