Skip to content

FACILITY DIRECTORY

EdgeConneX

EdgeConneX Memphis - EDCMEM01

4005 S Mendenhall Rd, Unit #6, Memphis, TN 38115, Memphis, Tennessee, United States

Availability to confirmRecord under review

A clearer view of this location.

EdgeConneX Memphis - EDCMEM01 is a directory record in Memphis. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
EdgeConneX
Reported power
0.5 MW
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
air
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

4005 S Mendenhall Rd, Unit #6, Memphis, TN 38115, Memphis, Tennessee, United States

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 5, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

Verified only the stated facility identity, power scope, gross floor area and cooling. The sheets report N+1 facility capacity without defining critical IT versus utility basis; retain unspecified basis rather than infer it from UPS/generator references. No generator sum, scalable target or unknown unleased availability is inserted. Remove the imported Tier certification assertion: the operator calls these Tier-3 designed. Remove repeated unsupported imported 1.400/1.050 PUE and 2020 construction-year defaults, not claims of measured current efficiency or a verified completion date. The 20+kW cabinet statement is a lower-bound capability, not an exact maximum density. Unchanged certifications and cloud connectivity fields are not independently certified by this review. Several sheets contain erroneous SOC Type numbering; none is newly copied. The 1.5 MW expansion target is planned and excluded here.

Suggest a listing correction ↗