FACILITY DIRECTORY
EdgeConneX ↗EdgeConneX Memphis - EDCMEM01
4005 S Mendenhall Rd, Unit #6, Memphis, TN 38115, Memphis, Tennessee, United States
Availability to confirmRecord under reviewA clearer view of this location.
EdgeConneX Memphis - EDCMEM01 is a directory record in Memphis. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- EdgeConneX
- Reported power
- 0.5 MW
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- air
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
4005 S Mendenhall Rd, Unit #6, Memphis, TN 38115, Memphis, Tennessee, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Verified only the stated facility identity, power scope, gross floor area and cooling. The sheets report N+1 facility capacity without defining critical IT versus utility basis; retain unspecified basis rather than infer it from UPS/generator references. No generator sum, scalable target or unknown unleased availability is inserted. Remove the imported Tier certification assertion: the operator calls these Tier-3 designed. Remove repeated unsupported imported 1.400/1.050 PUE and 2020 construction-year defaults, not claims of measured current efficiency or a verified completion date. The 20+kW cabinet statement is a lower-bound capability, not an exact maximum density. Unchanged certifications and cloud connectivity fields are not independently certified by this review. Several sheets contain erroneous SOC Type numbering; none is newly copied. The 1.5 MW expansion target is planned and excluded here.
- Official MEM01 sheet, page 2 visually reviewed: exact address, N+1 power, gross facility floor area and air/CRAC cooling; design Tier is not a certification ↗
- Q1 update official MEM01 sheet, page 2 visually reviewed: current reported versus planned power; publication date not independently stated ↗
- US Census current exact-address match to the operator-published street; approximate street interpolation, not rooftop or unit location ↗