Skip to content

FACILITY DIRECTORY

STACK INFRASTRUCTURE

STACK Infrastructure POR01B

POR01 campus, 3145 NE Brookwood Parkway, Hillsboro, Oregon, United States

Availability to confirmRecord under review

A clearer view of this location.

STACK Infrastructure POR01B is a directory record in Hillsboro. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
STACK INFRASTRUCTURE
Reported power
Not confirmed
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
Not specified
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

POR01 campus, 3145 NE Brookwood Parkway, Hillsboro, Oregon, United States

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 5, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

The current operator page uniquely identifies POR01B as a component of the POR01 campus. Washington County's official facility table explicitly associates STACK POR01 with 3145 NE Brookwood Parkway, independently corroborated by the state facility document. The city GIS supplies that exact address point on taxlot 1N228AA00400. This establishes campus visibility without claiming that the address or point is B's individual footprint. The inherited 3155 street is an adjacent separately numbered parcel; its existence alone does not prove a B building assignment. Replace it with an explicitly shared campus reference and preserve the original value in the audit. The operator page still mixes an 80 MW campus including 36 MW future expansion with a 72 MW B card. No current commissioned allocation can be established from those figures, so total and available power remain unknown. No operating stage, Tier, construction year, PUE or cooling specification is inferred from the map correction.

Suggest a listing correction ↗