FACILITY DIRECTORY
EdgeConneX ↗EdgeConneX New Albany - Phase I
9850 Innovation Campus Wy, New Albany, Ohio, United States
Availability to confirmRecord under reviewA clearer view of this location.
EdgeConneX New Albany - Phase I is a directory record in New Albany. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- EdgeConneX
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
9850 Innovation Campus Wy, New Albany, Ohio, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
The missing map can be restored at approximate campus precision from primary identity and county geometry. The Licking County hosted layer is a March 23, 2026 snapshot, not a claim of surveyed present building placement. The reference is the interior centroid of parcel 095-112080-02.001 at 9850 Innovation Campus Way. The applicant’s phases I and II narrative and the 2026 city report distinguish this southern site from phase III farther north; no point is placed on the temporary concrete batch plant. The exact Phase II building/address allocation remains unverified. Planned completion dates, floor-area targets and separate gas-generation ratings do not establish commissioned IT capacity or availability. Preserve unknown numeric power, prior specification removals, stable IDs and URL paths.
- City July 2025 engineering report page 20 visually reviewed: exact 9850 address, construction and proposed gas generation ↗
- June 16, 2025 planning packet, page 157 visually reviewed: phased data-center conversion plans and separate generation ↗
- Census exact-address attempt returned no matches; no substitute point inferred ↗
- Licking County hosted parcels: exact EdgeConneX South PropCo ownership, 9850 Innovation Campus Way and contiguous Clover Valley land ↗
- County-owned hosted parcel metadata: public monthly snapshot, last updated March 23, 2026 ↗
- City May 2026 staff report in June packet: phases I and II are distinct from phase III farther north ↗