Skip to content

FACILITY DIRECTORY

Africa Data Centres

ADC NBO1

Sameer Business Park, Block A, Mombasa Road, Nairobi, Kenya, Nairobi, Nairobi, Kenya

Availability to confirmRecord under review

A clearer view of this location.

ADC NBO1 is a directory record in Nairobi. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
Africa Data Centres
Site power
7.5 MW
Currently available IT power
Confirm by enquiry
Reported rack density
20 kW/rack
Reported cooling
air
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

Sameer Business Park, Block A, Mombasa Road, Nairobi, Kenya, Nairobi, Nairobi, Kenya

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 8, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

Fresh operator page was retrieved successfully through HTTP after the web tool timed out; cached text explicitly names NBO1 Nairobi and Sameer Business Park, Block A, Mombasa Road. LINX’s June and November 2023 announcements confirm ADC’s NBO1 as an actual exchange-hosting facility and distinguish it from iColo NBO1. ADC-associated PeeringDB facility 1964 independently matches the exact operator/code and Sameer/Mombasa address, providing the approximate map marker. Full master/history review supports correcting the bad Karen district field rather than preserving an indefinite identity hold. No inference about the cause of the import error is presented as fact. The current site-capacity wording (7.5 MW), the linked older sheet’s 2.7 MW IT load and its 3.6 MW full-buildout/37.5 MW utility figures are distinct scope/date statements; this location-only correction leaves numeric power unchanged pending capacity reconciliation. Unsupported inherited specifications remain unset. Capacity follow-up 2026-10-20: the current dedicated NBO1 page unambiguously reports Available site capacity7.5MW without a future qualifier. The archived operator Nairobi-Data-Sheet repeats this exact7.5MW site-capacity wording in its Power section, separately from37.5MW secured utilitycapacity. The newer linked sheet separately gives2.7MW clientIT and0.9MW planned2022 expansion to3.6MW. These are distinct scope/date statements, not proof that7.5MW is IT or an upgrade. Record current advertised7.5MW with basis site, reported and stage not_stated; do not assert installed customerIT or unleased supply. The older archived sheet gives15kW rackmax, while the currently linked technical sheet supports up to20kW; use the latter upperbound. Both current linked facility sheets support CRAC/contained air cooling and up to20kW per rack; this maximum is not standard allocation. No gross area is derived from white space. Available power remains null, location corrections and earlier evidence history are preserved, and unchanged fields are not recertified. PDF upload directories are not treated as publication dates.

Suggest a listing correction ↗