FACILITY DIRECTORY
Novva ↗Novva Las Vegas
6115 Nicco Way, North Las Vegas, Nevada, United States
Availability to confirmRecord under reviewA clearer view of this location.
Novva Las Vegas is a directory record in North Las Vegas. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Novva
- Site power
- 100 MW
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- air
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
6115 Nicco Way, North Las Vegas, Nevada, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 7, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Review covers the exact facility or development site and the listed supported facts only. Remove generic imported Tier, rack-density and construction-year claims without exact-site support. Unleased capacity is unknown; utility infrastructure, designed expansion and client deployment ranges are not available inventory. Unchanged certifications and cloud-connectivity fields are not newly certified. The current technical table explicitly labels 100 MW as the owner substation, and the later operator launch announcement confirms this first North Las Vegas facility as existing. Do not derive IT capacity from UPS lineups or generators. Gross area is 275,000 square feet in prose versus 246,328 in the technical table, so numeric space remains unknown. Postal schema uses Las Vegas but the dedicated text repeatedly identifies North Las Vegas; the physical city is corrected. Replace the copied 175 MW description and imported hybrid cooling with the actual air/fan-wall specification.