FACILITY DIRECTORY
CtrlS ↗CtrlS Mumbai DC1
Plot GEN 72/1/A, TTC Industrial Area, South Central Road, Mahape, Navi Mumbai, Maharashtra, India
Availability to confirmRecord under reviewA clearer view of this location.
CtrlS Mumbai DC1 is a directory record in Navi Mumbai. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- CtrlS
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
Plot GEN 72/1/A, TTC Industrial Area, South Central Road, Mahape, Navi Mumbai, Maharashtra, India
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 8, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
The CtrlS-maintained DC1 registry supplies the full Plot GEN 72/1/A address and a point identical to the operator-linked Mumbai map. This supports refining the imported Mahape locality and updating its approximate point. The website combines DC1 & DC2 at 40 MW; registry notes still say 42 MW for the same combined scope. Neither number belongs to DC1 alone, so power remains blank and both source scopes are retained in the audit. No arbitrary division or broader-campus total is used. Identity was checked against all 4,551 master records: this operator/building code/market occurs only once, and no other row represents the intended building. This is a correction of a malformed imported location, not a merger of distinct phases. Current available power remains unknown. Clear generic Tier III/PUE 1.50 imports; do not translate Rated-4 into a different certification framework. Unchanged fields remain unrecertified.