Skip to content

FACILITY DIRECTORY

CtrlS

CtrlS Mumbai DC1

Plot GEN 72/1/A, TTC Industrial Area, South Central Road, Mahape, Navi Mumbai, Maharashtra, India

Availability to confirmRecord under review

A clearer view of this location.

CtrlS Mumbai DC1 is a directory record in Navi Mumbai. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
CtrlS
Reported power
Not confirmed
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
Not specified
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

Plot GEN 72/1/A, TTC Industrial Area, South Central Road, Mahape, Navi Mumbai, Maharashtra, India

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 8, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

The CtrlS-maintained DC1 registry supplies the full Plot GEN 72/1/A address and a point identical to the operator-linked Mumbai map. This supports refining the imported Mahape locality and updating its approximate point. The website combines DC1 & DC2 at 40 MW; registry notes still say 42 MW for the same combined scope. Neither number belongs to DC1 alone, so power remains blank and both source scopes are retained in the audit. No arbitrary division or broader-campus total is used. Identity was checked against all 4,551 master records: this operator/building code/market occurs only once, and no other row represents the intended building. This is a correction of a malformed imported location, not a merger of distinct phases. Current available power remains unknown. Clear generic Tier III/PUE 1.50 imports; do not translate Rated-4 into a different certification framework. Unchanged fields remain unrecertified.

Suggest a listing correction ↗