Skip to content

FACILITY DIRECTORY

Raxio

Raxio UG1 — Kampala

Plot 781, Block 113, Namanve Industrial Park, Kampala–Jinja Highway, Kampala, Kampala, Uganda

Availability to confirmRecord under review

A clearer view of this location.

Raxio UG1 — Kampala is a directory record in Kampala. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
Raxio
Critical IT power
1.5 MW
Currently available IT power
Confirm by enquiry
Reported rack density
21 kW/rack
Reported cooling
air
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

Plot 781, Block 113, Namanve Industrial Park, Kampala–Jinja Highway, Kampala, Kampala, Uganda

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 8, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

There is one Raxio master record in this country; the unique operator site code and market establish identity. No facility IDs are merged. Current operator specification reports 1.5 MW IT; the 2025 ITU national strategy explicitly reports 1.5 MW installed based on local stakeholder interviews, supporting a later installed total than the 0.5 MW initial phase described in the older 2024 IFC appraisal. PDF maximum rack density is 4–21 kW (ET1 1–21 kW), so maximum field uses 21 only; ordinary density remains unknown. Cooling is indirect adiabatic air cooling, not direct liquid-to-chip. White space is not copied into gross building area. Launch dates are not assumed original construction years. Clear generic inherited Tier III: current source distinguishes design certification and/or phase-specific facility certification; no new whole-facility certified tier is assigned. Several reused PDF cover marks even name Angola on another country sheet, so those marks are not used as certification evidence. Kampala is retained as operator market terminology; the corrected address and approximate point explicitly identify Namanve Industrial Park outside the CBD. Clear the unsupported inherited exact PUE 1.50; design targets and reported ranges are not silently converted to measured PUE. Available power remains unknown. Unchanged legacy fields are not recertified. PDF upload path is not treated as a printed publication date.

Suggest a listing correction ↗