FACILITY DIRECTORY
Raxio ↗Raxio UG1 — Kampala
Plot 781, Block 113, Namanve Industrial Park, Kampala–Jinja Highway, Kampala, Kampala, Uganda
Availability to confirmRecord under reviewA clearer view of this location.
Raxio UG1 — Kampala is a directory record in Kampala. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Raxio
- Critical IT power
- 1.5 MW
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- 21 kW/rack
- Reported cooling
- air
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
Plot 781, Block 113, Namanve Industrial Park, Kampala–Jinja Highway, Kampala, Kampala, Uganda
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 8, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
There is one Raxio master record in this country; the unique operator site code and market establish identity. No facility IDs are merged. Current operator specification reports 1.5 MW IT; the 2025 ITU national strategy explicitly reports 1.5 MW installed based on local stakeholder interviews, supporting a later installed total than the 0.5 MW initial phase described in the older 2024 IFC appraisal. PDF maximum rack density is 4–21 kW (ET1 1–21 kW), so maximum field uses 21 only; ordinary density remains unknown. Cooling is indirect adiabatic air cooling, not direct liquid-to-chip. White space is not copied into gross building area. Launch dates are not assumed original construction years. Clear generic inherited Tier III: current source distinguishes design certification and/or phase-specific facility certification; no new whole-facility certified tier is assigned. Several reused PDF cover marks even name Angola on another country sheet, so those marks are not used as certification evidence. Kampala is retained as operator market terminology; the corrected address and approximate point explicitly identify Namanve Industrial Park outside the CBD. Clear the unsupported inherited exact PUE 1.50; design targets and reported ranges are not silently converted to measured PUE. Available power remains unknown. Unchanged legacy fields are not recertified. PDF upload path is not treated as a printed publication date.
- Current operator facility page: identity, advertised IT capacity and operating/development stage ↗
- Financier environmental appraisal: February 2024 initial phases; historical scope retained ↗
- Facility record maintained under Raxio Data Centres organization; exact site address and approximate geocode ↗
- Current operator technical specification; pages 1 and 3 rendered and visually verified ↗
- Dated operator facility launch and capacity context ↗
- ITU 2025 national strategy, PDF page 15 / printed page 2: explicitly installed 1.5 MW; visually verified ↗