FACILITY DIRECTORY
Edged Energy ↗Edged Council Bluffs Campus
College Rd and E Kanesville Blvd, Council Bluffs, Iowa, United States
Availability to confirmRecord under reviewA clearer view of this location.
Edged Council Bluffs Campus is a directory record in Council Bluffs. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Edged Energy
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
College Rd and E Kanesville Blvd, Council Bluffs, Iowa, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Approximate centroid calculated from the signed polygon rings of the three adjoining EDC Omaha Landco LLC parcels in the official county GIS, matched to the recorded CB Technology Park subdivision and the city-approved Project LOLA plan. Coordinates replace a city-center location approximately 5 km west of the actual project. Proposed two-building campus; no operational capacity is established by this location evidence. The September 2026 operator announcement confirms construction topping-out of OMA01-1 and OMA01-2, not commissioning. The 200 MW campus design is not allocated to either building or entered as operating capacity. Inherited Tier, portfolio PUE, generic cooling and 2020 build date are cleared. Available power remains unknown.
- City of Council Bluffs revised development plan, case PI-24-001(M), resolution 25-155 ↗
- Revised Project LOLA site plan, sheet CS100 page 3: Building 1 north, Building 2 south ↗
- County-recorded CB Technology Park subdivision, sheets 1 and 3: EDC Omaha Landco LLC c/o Edged Energy; Lot 2 north and Lot 3 south ↗
- Official Pottawattamie County parcels, exact EDC Omaha Landco owner query with WGS84 centroids ↗
- Edged September 2026 topping-out announcement for both Council Bluffs buildings ↗