Skip to content

FACILITY DIRECTORY

Edged Energy

Edged Council Bluffs - Building 2

College Rd and E Kanesville Blvd, Council Bluffs, Iowa, United States

Availability to confirmRecord under review

A clearer view of this location.

Edged Council Bluffs - Building 2 is a directory record in Council Bluffs. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
Edged Energy
Reported power
Not confirmed
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
Not specified
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

College Rd and E Kanesville Blvd, Council Bluffs, Iowa, United States

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 5, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

The city-approved April 2025 plan shows Building 2 in the south part of Project LOLA. The October 2025 recorded subdivision maps this ground to CB TECHNOLOGY PARK SUB LT 3, owner EDC Omaha Landco LLC c/o Edged Energy. The county GIS supplies the parcel centroid. This is a supported approximate parcel point for the planned building, not evidence of completion, operational status or available power. The 2025 recorded plat supersedes the preliminary two-lot numbering; do not confuse Building 1 with recorded Lot 1 (the small switchyard parcel). The September 2026 operator announcement confirms construction topping-out of OMA01-1 and OMA01-2, not commissioning. The 200 MW campus design is not allocated to either building or entered as operating capacity. Inherited Tier, portfolio PUE, generic cooling and 2020 build date are cleared. Available power remains unknown.

Suggest a listing correction ↗