FACILITY DIRECTORY
CyrusOne Data Centers ↗CyrusOne - Talkington Township DC2
Thayer Rd & Clark Rd, Talkington Township, Illinois, United States
Availability to confirmRecord under reviewA clearer view of this location.
CyrusOne - Talkington Township DC2 is a directory record in Talkington Township. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- CyrusOne Data Centers
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
Thayer Rd & Clark Rd, Talkington Township, Illinois, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
The operator describes a proposed Sangamon County campus. RECC confirms the Talkington Township project and future electricity-service context; it does not establish installed MW. The county’s February6,2026 project map outlines the actual campus parcels far southwest of the inherited Springfield-center pin. Its embedded geographic control points allow an approximate centroid of the outlined campus to be derived. Correct locality to Talkington Township and use the same disclosed campus-level reference for these associated records. Individual DC1–DC6 building identities, final building count and precise footprints remain unverified; the shared campus pin does not certify them. Coordinate calculation and source control points are retained in talkington-geopdf-method.json. Current power and availability remain unknown. The inherited2020 opening year, Tier and exact PUE/cooling defaults lack facility-specific support and are cleared. Other legacy certification, connectivity and sustainability assertions are not certified by this review.