FACILITY DIRECTORY
Serverfarm ↗Serverfarm Atlanta Data Center ATL2
10835 Hazelbrand Rd, Covington, Georgia, United States
Availability to confirmRecord under reviewA clearer view of this location.
Serverfarm Atlanta Data Center ATL2 is a directory record in Covington. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Serverfarm
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Pin withheld while the location is reviewed.
The saved coordinates could not be used reliably. The record remains available by its stated address.
10835 Hazelbrand Rd, Covington, Georgia, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Covington council minutes from December 2024 explicitly connect Serverfarm to the annexation request for 10835 Hazelbrand Road; January 2025 minutes approve industrial zoning for a data center. The dated operator September 2026 update describes ATL2 as a retrofit/conversion development, not completed capacity. The Georgia EPD indexed narrative/draft were unavailable on direct opening (404) and are not relied upon as opened evidence; no standby-generator sum is applied. Census exact address request returned no match. Correct city and clear the inherited central Atlanta placeholder shared by many unrelated regional records. Existing 2020 original-building year stays unverified, since conversion of an older warehouse does not prove its construction year. Available power stays unknown. No planned capacity or generator/MVA capacity is inserted as current power. Unsupported inherited Tier/PUE defaults are cleared; unchanged imported fields remain unverified.