FACILITY DIRECTORY
Bolingbroke Technology Center, LLC ↗Bolingbroke Technology Campus - Bldg 7
US Highway 41 south side, west of I-475, Bolingbroke, Monroe County, GA, Bolingbroke, Georgia, United States
Availability to confirmRecord under reviewA clearer view of this location.
Bolingbroke Technology Campus - Bldg 7 is a directory record in Bolingbroke. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Bolingbroke Technology Center, LLC
- Reported power
- Not confirmed
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Pin withheld while the location is reviewed.
The saved coordinates could not be used reliably. The record remains available by its stated address.
US Highway 41 south side, west of I-475, Bolingbroke, Monroe County, GA, Bolingbroke, Georgia, United States
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Reviewed 20 October 2026. Monroe County’s approved 5 August 2025 minutes pp2–6 identify Bolingbroke Technology Center west of I-475/US41 on the south side of US41, name applicants/owners Otis Ingram and Henry Davis Properties, list nine parcels, and record a 5–0 vote denying R-1-to-C-1 rezoning. This is the same imported proposal, not an Atlanta operating facility. Replace unsupported operating-style prose, clear inherited Tier 3/PUE 1.400/year 2020 defaults and remove downtown Atlanta points. The source establishes denial of the 2025 application; it does not establish permanent withdrawal or the outcome of any later proceeding. No later approval or operation was verified. Project website now redirects to a password page, which provides no status evidence. Legacy building numbers remain unverified.