Skip to content

FACILITY DIRECTORY

199 Bassett Owner LLC

199 Bassett Street — Proposed AI and Data Center Project

199 Bassett Street, San Jose, CA 95110, San Jose, California, United States

Availability to confirmRecord under review

A clearer view of this location.

199 Bassett Street — Proposed AI and Data Center Project is a directory record in San Jose. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
199 Bassett Owner LLC
Reported power
Not confirmed
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
Not specified
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

199 Bassett Street, San Jose, CA 95110, San Jose, California, United States

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 2, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

Reviewed 20 October 2026. Exact physical project identity is now corroborated by the public San Jose permit system: address search returns property RSN 28543 and APN 25923029 for 199 Bassett Street; the same property has PDC25-021 / folder 2135116, filed 3 July 2025, for data-center rezoning and marked Under Review with no issue or final date. Linked environmental review ER25-130 / folder 2135123 is Under Review. PRE25-138 / folder 2120532 describes an eight-story AI R&D proposal; its preliminary review was completed 10 June 2025, which is not construction approval. Both public applicant/owner rosters name 199 BASSETT OWNER LLC as Owner and C2K Architecture as Applicant. The inherited Arena Investors label is retained in this history, but beneficial Arena ownership is not independently verified here. Provider display is changed to the source-named legal project owner, not represented as an operating colocation provider. The municipal GIS AD24-132 record links the exact APN/address to the approximate parcel point 37.3404366222, -121.8975489253. That older record is used solely for the parcel/address geometry, not to establish data-center approval. Proposed non-residential area appears as 291,800 sq ft in current application metadata, differing from the older 281,800 sq ft media proposal; neither is commissioned or leasable data-center space, so total_space_sqft remains unknown. Unsupported imported 440,000 sq ft, Tier 3, PUE 1.54, 2007 build year, air cooling and 18.1 MW prose are removed. Total and available power remain unknown. No active operations, development approval, construction start, completion, current vacancy or sale mandate is established. Prior review retained: Reviewed 19 October 2026. Opened municipal attachment confirms the exact parcel/address and historical warehouse-to-condominium proposal, map dated May 17, 2017. Opened project architect page describes a later 803-unit co-living scheme as unbuilt. These sources establish project history, not current Arena AI/data-center approval, construction, operations, capacity or availability. Historical residential approvals must not be used as evidence of an operating data center. Current Arena ownership and AI development proposal require a current primary record; secondary reporting is a lead only. Current ownership, AI-development permit/status, physical facility identity and power remain unconfirmed. Imported unsupported power and density values are withheld; earlier values remain in recovery history.

Suggest a listing correction ↗