Reach Data Center Decision MakersAdvertise

Hivelocity Los Angeles

Hivelocity · 600 W. 7th St, Los Angeles, California

AI-Ready

Get a Quote

MW power
84.9
kW / rack
32
Tier
Tier 4
Sq ft
152,000
PUE
1.48
AI score
97/100

About this facility

Hivelocity Los Angeles is a colocation data center in Los Angeles, California operated by Hivelocity. The facility is rated Tier 4, was built in 2019 and uses hybrid cooling. It is flagged AI-ready for high-density GPU deployments. It is one of 81 facilities tracked in Los Angeles, so it can be compared side by side with the rest of that market.

Hivelocity Los Angeles is a Tier 4 data center facility located in Los Angeles, California. The facility offers 152,000 sq ft of data center space with 84.9 MW of total power capacity. GPU-ready infrastructure supports AI/ML workloads with high-density power configurations. Direct connectivity available to AWS Direct Connect, Azure ExpressRoute, Google Cloud Interconnect.

  • Remote Hands
  • Cross Connect

Facility specifications

Operator
Hivelocity
Tier
Tier 4
Total power
84.9 MW
Available power
46.8 MW
Rack density
32 kW/rack
Cooling
hybrid
PUE
1.48
Total space
152,000 sq ft
Year built
2019
Renewable energy
32%
AI readiness score
97 / 100

Cloud on-ramps

  • AWS Direct Connect
  • Azure ExpressRoute
  • Google Cloud Interconnect

Certifications and compliance

  • SOC 2 Type II

Location

600 W. 7th St, Los Angeles, California · Open in Google Maps

Common questions

Who operates Hivelocity Los Angeles?

Hivelocity Los Angeles in Los Angeles, California is operated by Hivelocity.

What tier is Hivelocity Los Angeles?

Hivelocity Los Angeles is rated Tier 4.

Is Hivelocity Los Angeles AI-ready?

Hivelocity Los Angeles is flagged AI-ready, meaning it is built for high-density GPU deployments.

What other data centers are near Hivelocity Los Angeles?

81 facilities are tracked in Los Angeles. The closest listed here are 600 West 7th Street (LAX10), 611 Wilshire and 624 South Grand.

How do I get a quote for Hivelocity Los Angeles?

Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for Hivelocity Los Angeles and comparable facilities.

Request capacity at Hivelocity Los Angeles

One requirement, matched against this facility and every alternative in the market.

Get a quote