ColoCrossing Los Angeles
ColoCrossing · 1200 W 7th Street, Los Angeles, California
AI-Ready
- MW power
- 22.3
- kW / rack
- 31
- Tier
- Tier 4
- Sq ft
- 468,000
- PUE
- 1.56
- AI score
- 91/100
About this facility
ColoCrossing Los Angeles is a colocation data center in Los Angeles, California operated by ColoCrossing. The facility is rated Tier 4, was built in 2018 and uses hybrid cooling. It is flagged AI-ready for high-density GPU deployments. It is one of 81 facilities tracked in Los Angeles, so it can be compared side by side with the rest of that market.
ColoCrossing Los Angeles is a Tier 4 data center facility located in Los Angeles, California. The facility offers 468,000 sq ft of data center space with 22.3 MW of total power capacity. GPU-ready infrastructure supports AI/ML workloads with high-density power configurations. Direct connectivity available to AWS Direct Connect, Google Cloud Interconnect.
- Remote Hands
- Cross Connect
Facility specifications
- Operator
- ColoCrossing
- Tier
- Tier 4
- Total power
- 22.3 MW
- Available power
- 10.5 MW
- Rack density
- 31 kW/rack
- Cooling
- hybrid
- PUE
- 1.56
- Total space
- 468,000 sq ft
- Year built
- 2018
- Renewable energy
- 10%
- AI readiness score
- 91 / 100
Cloud on-ramps
- AWS Direct Connect
- Google Cloud Interconnect
Certifications and compliance
- SOC 2 Type II
Location
1200 W 7th Street, Los Angeles, California · Open in Google Maps
Common questions
Who operates ColoCrossing Los Angeles?
ColoCrossing Los Angeles in Los Angeles, California is operated by ColoCrossing.
What tier is ColoCrossing Los Angeles?
ColoCrossing Los Angeles is rated Tier 4.
Is ColoCrossing Los Angeles AI-ready?
ColoCrossing Los Angeles is flagged AI-ready, meaning it is built for high-density GPU deployments.
What other data centers are near ColoCrossing Los Angeles?
81 facilities are tracked in Los Angeles. The closest listed here are 600 West 7th Street (LAX10), 611 Wilshire and 624 South Grand.
How do I get a quote for ColoCrossing Los Angeles?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for ColoCrossing Los Angeles and comparable facilities.
Request capacity at ColoCrossing Los Angeles
One requirement, matched against this facility and every alternative in the market.



