STACK Infrastructure SVY03A
STACK INFRASTRUCTURE · 26203 Production Ave, Hayward, California
Operator verified
- Tier
- Tier 3
- PUE
- 1.40
- AI score
- 15/100
About this facility
Colocation; Powered shell (POWERSTACK); Commissioned capacity/rack-ready (READYSTACK); Single & multi-tenant; Build-to-suit; Office/storage space | Sustainability: Powered by 100% renewable energy; Minimal flood hazard area | Fiber: CenturyLink Metro; CenturyLink Metro Leased; Electric Lightwave; ExteNet Systems; Hudson Fiber; Integra; Level3; Point to Point; Silicon Valley Fiber; Telia Carrier; TPx Communication; Vast Networks; Windstream; Zayo Metro (15 networks); Dark fiber | Fire Suppression
- N+1 Redundancy
- Carrier Neutral
- On-site Security
- Remote Hands
- Meet-Me Room
Facility specifications
- Operator
- STACK INFRASTRUCTURE
- Tier
- Tier 3
- Cooling
- hybrid
- PUE
- 1.40
- Year built
- 2020
- Renewable energy
- 0%
- AI readiness score
- 15 / 100
Certifications and compliance
- Certifications supported (specifics: SOC 2
- ISO 27001
- etc. not listed)
Location
26203 Production Ave, Hayward, California · Open in Google Maps
Request capacity at STACK Infrastructure SVY03A
One requirement, matched against this facility and every alternative in the market.