STACK Infrastructure SYD01
STACK INFRASTRUCTURE · 78 Lockwood Road, Sydney, NSW
- MW power
- 360
- Tier
- Tier 1
- Sq ft
- 387,501
- PUE
- 0.00
- AI score
- 5/100
About this facility
STACK Infrastructure SYD01 is a colocation data center in Sydney, NSW operated by STACK INFRASTRUCTURE. The facility is rated Tier 1. It is one of 21 facilities tracked in Sydney, so it can be compared side by side with the rest of that market.
STACK Infrastructure SYD01 is an APAC expansion data center listing operated by STACK INFRASTRUCTURE. Location: Sydney (Erskine Park), NSW, Australia. Verified/publicly referenced power capacity: 360 MW. Verified/publicly referenced total space: 387,501 sq ft. Source URLs: https://www.stackinfra.com/locations/asia-pacific/sydney/syd01/ Verification status: Verified - operator website. Admin QA notes: Planned; 360MW from STACK official page
- 132kV substation 450+MW capacity
- 19+ acres
- 36,000m² technical space
- 360MW
- ADMIN_REVIEW: pue not publicly disclosed
- ADMIN_REVIEW: tier not publicly disclosed
- ADMIN_REVIEW: year_built not publicly disclosed
- Carrier-Neutral Colocation / Hyperscale
Facility specifications
- Operator
- STACK INFRASTRUCTURE
- Tier
- Tier 1
- Total power
- 360 MW
- PUE
- 0.00
- Total space
- 387,501 sq ft
- AI readiness score
- 5 / 100
Cloud on-ramps
- Azure, AWS
Location
78 Lockwood Road, Sydney, NSW · Open in Google Maps
Common questions
Who operates STACK Infrastructure SYD01?
STACK Infrastructure SYD01 in Sydney, NSW is operated by STACK INFRASTRUCTURE.
What tier is STACK Infrastructure SYD01?
STACK Infrastructure SYD01 is rated Tier 1.
Is STACK Infrastructure SYD01 AI-ready?
STACK Infrastructure SYD01 is not currently flagged AI-ready in this directory. Compare AI-ready facilities in the same market to see the alternatives.
What other data centers are near STACK Infrastructure SYD01?
21 facilities are tracked in Sydney. The closest listed here are Equinix SY1, Equinix SY2 and Equinix SY3.
How do I get a quote for STACK Infrastructure SYD01?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for STACK Infrastructure SYD01 and comparable facilities.
Request capacity at STACK Infrastructure SYD01
One requirement, matched against this facility and every alternative in the market.
