FACILITY DIRECTORY
Macquarie Data Centres ↗Macquarie IC3 East Macquarie Park
17–23 Talavera Road, Macquarie Park NSW 2113, Macquarie Park, NSW, Australia
Availability to confirmRecord under reviewA clearer view of this location.
Macquarie IC3 East Macquarie Park is a directory record in Macquarie Park. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.
- Reported operator
- Macquarie Data Centres
- Critical IT power
- 12 MW
- Currently available IT power
- Confirm by enquiry
- Reported rack density
- Not confirmed
- Reported cooling
- Not specified
- Deployment date
- Confirm by enquiry
Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.
Location
Locations are approximate directory positions. Select a cluster to explore.
17–23 Talavera Road, Macquarie Park NSW 2113, Macquarie Park, NSW, Australia
Search this address in Google Maps ↗Record information
Evidence reviewed: Oct 20, 2026
- Source record updated
- May 5, 2026
- Directory import
- Aug 17, 2026
- Current availability verification
- Not supplied
Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.
View sources and review notes
Unique operator code and market establish the existing stable facility identity; no ID merge. Replace stale importer/admin prose and unsupported Tier I with a factual facility description. Availability zones numbered Tier 1 are not Uptime certification. Use the explicitly labeled individual-building IT capacity, not future 65 MW campus end-state or 47 MW IC3 Super West. The same operator-linked address marker is shared campus precision, not a distinct entrance for each building. The original imported point is about 600m from this operator address marker. The existing description already identifies IC3 East as the operational part and Super West as separate future development. Clarify East in the name instead of combining buildings or assigning the campus total. White/technical area is not converted into gross-building space. Campus cooling options, design PUE and unquantified high-density claims are not copied as exact installed facility attributes. Unchanged fields remain unrecertified.
- Operator contact page distinguishes facility addresses from corporate offices ↗
- Current dedicated operator facility page explicitly reports individual IT load ↗
- Current Sydney facility comparison, distinct IC1/IC2/IC3 East scopes ↗
- Campus comparison separately identifies IC2 6 MW, IC3 East 12 MW and future IC3 Super West 47 MW ↗
- Map target explicitly linked by the operator for this facility address; !3d/!4d property coordinates ↗