NEXTDC P2 Perth
NEXTDC · 11 Newcastle Street, Perth, WA
AI-Ready
- MW power
- 20
- Tier
- Tier 1
- Sq ft
- 129,167
- PUE
- 0.00
- AI score
- 35/100
About this facility
NEXTDC P2 Perth is a colocation data center in Perth, WA operated by NEXTDC. The facility is rated Tier 1 and uses liquid cooling. It is flagged AI-ready for high-density GPU deployments. It is one of 5 facilities tracked in Perth, so it can be compared side by side with the rest of that market.
NEXTDC P2 Perth is an APAC expansion data center listing operated by NEXTDC. Location: Perth (CBD), WA, Australia. Verified/publicly referenced power capacity: 20 MW. Verified/publicly referenced total space: 129,167 sq ft. Source URLs: https://www.nextdc.com/data-centres/perth-data-centres/p2-perth, https://www.datacentermap.com/australia/perth/ Verification status: Verified - operator website. Admin QA notes: Floor space 12
- 12,000m² technical space
- 20MW+
- ADMIN_REVIEW: pue not publicly disclosed
- ADMIN_REVIEW: tier not publicly disclosed
- ADMIN_REVIEW: year_built not publicly disclosed
- Carrier-Neutral Colocation
- Carrier: 750+ partners
- Perth CBD
Facility specifications
- Operator
- NEXTDC
- Tier
- Tier 1
- Total power
- 20 MW
- Cooling
- liquid
- PUE
- 0.00
- Total space
- 129,167 sq ft
- AI readiness score
- 35 / 100
Cloud on-ramps
- Azure, AWS, Google Cloud, IBM Cloud, Oracle Cloud
Certifications and compliance
- ISO 9001
- ISO 14001
- ISO 45001
- ISO 27001
- SOC 1 Type II
- SOC 2 Type II
- PCI DSS
- Uptime Institute Tier IV Gold
- NABERS
Location
11 Newcastle Street, Perth, WA · Open in Google Maps
Common questions
Who operates NEXTDC P2 Perth?
NEXTDC P2 Perth in Perth, WA is operated by NEXTDC.
What tier is NEXTDC P2 Perth?
NEXTDC P2 Perth is rated Tier 1.
Is NEXTDC P2 Perth AI-ready?
NEXTDC P2 Perth is flagged AI-ready, meaning it is built for high-density GPU deployments.
What other data centers are near NEXTDC P2 Perth?
5 facilities are tracked in Perth. The closest listed here are Equinix PE1, Equinix PE2 and Equinix PE3.
How do I get a quote for NEXTDC P2 Perth?
Send your power, space and timing requirements through the quote form and GoDataCenters comes back within 24 hours with pricing for NEXTDC P2 Perth and comparable facilities.
Request capacity at NEXTDC P2 Perth
One requirement, matched against this facility and every alternative in the market.

