Skip to content

FACILITY DIRECTORY

EdgeCore

EdgeCore Phoenix Campus

3856 S Everton Terrace, Mesa, Arizona, United States

Availability to confirmRecord under review

A clearer view of this location.

EdgeCore Phoenix Campus is a directory record in Mesa. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
EdgeCore
Reported power
Not confirmed
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
Not specified
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

3856 S Everton Terrace, Mesa, Arizona, United States

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 5, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

This review certifies only the supported facts listed here. The operator current model is one hyperscale customer per building; remove generic retail-cage/cabinet and remote-hands prose. Remove imported Tier, exact PUE and year claims lacking facility-specific support. Unleased power is unknown. Unchanged legacy fields, including features and connectivity, are not newly verified. The same county campus marker is intentionally shared across the six related listings; it identifies the retained base-campus address and does not assert roof-level phase coordinates. The 2022-era five-building plan differs from the 2025 three-building condo plat and later 84-acre expansion. Do not use old PH02–PH05 design ranges or infer phase commissioning from the current 496 MW campus headline. The May 2025 release contains a 206 MW constructed/commissioned quote but explicitly calls PH02 and PH03 still under construction elsewhere; this ambiguity is preserved rather than selecting a whole-campus operating number. Do not repeat PH01’s 26 MW in the parent campus numeric field or treat the 496 MW masterplan as entirely operating.

Suggest a listing correction ↗