Skip to content

FACILITY DIRECTORY

EdgeCore

EdgeCore Florence - Building 8 (unconfirmed phase)

E Arizona Farms Rd & N Attaway Rd, Florence, Arizona, United States

Availability to confirmRecord under review

A clearer view of this location.

EdgeCore Florence - Building 8 (unconfirmed phase) is a directory record in Florence. Use the information below as a starting point, then confirm the facility scope, technical requirements and availability.

Reported operator
EdgeCore
Reported power
Not confirmed
Currently available IT power
Confirm by enquiry
Reported rack density
Not confirmed
Reported cooling
Not specified
Deployment date
Confirm by enquiry

Reported power is not available capacity. The source notes identify reviewed specifications; other imported details remain unconfirmed.

Location

1 mapped locations

Locations are approximate directory positions. Select a cluster to explore.

E Arizona Farms Rd & N Attaway Rd, Florence, Arizona, United States

Search this address in Google Maps ↗

Record information

Evidence reviewed: Oct 20, 2026

Source record updated
May 5, 2026
Directory import
Aug 17, 2026
Current availability verification
Not supplied

Source-update and import dates describe the record’s history. They do not confirm current specifications or available capacity.

View sources and review notes

This review distinguishes proposed or phased development from operating inventory. Power and availability remain unknown; no future campus design, generator sum, MVA substation rating or planned completion date is inserted as delivered capacity. Remove unsupported imported Tier, exact PUE, construction-year and retail-service claims. Unchanged fields are not certified wholesale. The planning package separately names Florence Tech Park PZ-25-34 (Ryan Companies near Judd/Attaway) and Dobson Farms East PZ-25-55 (239-acre project at Arizona Farms/Attaway). The latter contains EdgeCore’s traffic study and test-fit drawing. Its page 132 says northwest, but pages 110, 126, 133–134 and the EdgeCore plan establish northeast; preserve that internal directional typo rather than map the western parcel. County parcel 21046002A is a 639-acre parent, so its centroid was deliberately not used for the 239-acre subsite. The exact intersection marker is at the proposed site boundary and shared by all eleven rows. The November 2024 drawing is expressly incomplete/not for construction; 72 MW per planned building and 330/130 MVA substations are excluded from operating numeric fields. The legacy Building 1–10 to PH07–PH16 crosswalk is not invented. LEED-certified and 2020-built claims contradict the described undeveloped proposal and are removed.

Suggest a listing correction ↗