Find colocation capacity for your next deploymentGet a Quote

Columbus Data Center Market: Colocation, Power and Pricing (2026)

Columbus data center market 2026: 506 MW inventory, 0.1% vacancy, pricing $125-165/kW/month for 1-5 MW, 58 facilities tracked. Operators, power, incentives.

Columbus is a Tier 2 US data center market in OH on the PJM grid. Colocation inventory is about 506 MW (JLL Midyear 2025 (colocation); a 2026 southwest-Ohio study cited Columbus at ‘roughly 1.9 gigawatts’ incl. hyperscale (H1 2025)). Vacancy is 0.1% (JLL H1 2026 press release: Columbus ‘compressed to 0.1% vacancy’; JLL H1 2025: 1%). Typical colocation pricing runs $125-165/kW/month for 1-5 MW (JLL H1 2025). GoDataCenters tracks 58 facilities from 8 operators in the metro.

Columbus data center market at a glance

Columbus market statistics, updated 2026-09-16
Metric Value Source
Operational colocation inventory 506 MW JLL Midyear 2025 (colocation); a 2026 southwest-Ohio study cited Columbus at ‘roughly 1.9 gigawatts’ incl. hyperscale (H1 2025)
Under construction 38 MW JLL Midyear 2025 (colocation only) (H1 2025)
Planned pipeline 3,262 MW JLL Midyear 2025 (H1 2025)
Vacancy 0.1% JLL H1 2026 press release: Columbus ‘compressed to 0.1% vacancy’; JLL H1 2025: 1%
Typical pricing (kW/month) $125-165/kW/month for 1-5 MW (JLL H1 2025)
Grid operator PJM
Power utility AEP Ohio
Facilities tracked by GoDataCenters 58 GoDataCenters facility database

How available is power for data centers in Columbus?

AEP Ohio: 30,000 MW of additional demand requested (2023); current applications 13,022 MW with contracts for 5,342 MW (ABC6, 2026). Nearly 80 new data centers could be built in Ohio by 2030.

Power is served by AEP Ohio. Grid operator: PJM.

Who are the major data center operators in Columbus?

Major operators active in the market: Amazon Web Services, Google (New Albany), Meta (New Albany), Microsoft, Cologix (COL1-COL4), Vantage, QTS, 5C Data Centers, Compass, EdgeConneX, DataBank.

Largest operators by facility count in Columbus
Operator Facilities in metro (GoDataCenters DB)
Cologix 6
Vantage Data Centers 5
QTS Data Centers 5
CeraNet, Inc. 3
EdgeConneX 3
Lumen 3
Cogent Communications, Inc. 2
STACK INFRASTRUCTURE 2

Facility concentration by city: Columbus (58).

What does colocation cost in Columbus?

Typical pricing bands: $125-165/kW/month for 1-5 MW (JLL H1 2025). Bands are brokerage-reported ranges for the market, not quotes. Actual rates depend on power density, term, ramp and redundancy.

Fiber and carrier presence in Columbus

Cologix COL1/COL2/COL4 are the most popular interconnection facilities (Baxtel).

What tax incentives apply to data centers in OH?

Item Detail
State sales/use tax exemption yes (new applications paused)
Program Ohio Data Center Sales Tax Exemption (Ohio Tax Credit Authority)
Threshold $100M investment + $1.5M annual payroll (SDIA); JobsOhio adds cash grants
Note Gov. DeWine directed the Ohio Tax Credit Authority to stop accepting new applications (June 2026); HB 975 would end exemption Oct 1, 2026 (not enacted); HB 198 pending to cap abatements at 75%.

Columbus colocation by capacity band

Frequently asked questions

How much data center capacity is in Columbus?

About 506 MW of operational colocation inventory per JLL Midyear 2025 (colocation); a 2026 southwest-Ohio study cited Columbus at ‘roughly 1.9 gigawatts’ incl. hyperscale (H1 2025). A further 38 MW is under construction.

What is the data center vacancy rate in Columbus?

0.1% per JLL H1 2026 press release: Columbus ‘compressed to 0.1% vacancy’; JLL H1 2025: 1%.

What is the typical colocation price per kW in Columbus?

$125-165/kW/month for 1-5 MW (JLL H1 2025).

Which grid serves Columbus data centers?

PJM. Utility: AEP Ohio.

Does OH offer a data center sales tax exemption?

yes (new applications paused). Program: Ohio Data Center Sales Tax Exemption (Ohio Tax Credit Authority). Threshold: $100M investment + $1.5M annual payroll (SDIA); JobsOhio adds cash grants.

Is Columbus a Tier 1, Tier 2 or Tier 3 data center market?

Columbus is classified as a Tier 2 market, using the CBRE, JLL and Cushman & Wakefield market tracking conventions.

Related pages

Need capacity in Columbus?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Operate a facility here?

List it on GoDataCenters to reach buyers searching this market.

List a facility

Sources

Data compiled by GoDataCenters. Last updated 2026-09-16. Figures are market-level ranges from cited reports, not quotes.





Need capacity?

Send your location, power and timing requirements to request a colocation shortlist.

Get a quote