Reach Data Center Decision MakersAdvertise

1-5 MW Colocation in Northern Virginia

1-5 MW colocation in Northern Virginia: pricing $190-235/kW/month, vacancy 0.3%, operators, power lead times and what to put in the RFP.

1-5 MW requirements in Northern Virginia fall into the retail and small wholesale colocation segment. Market pricing bands: $190-235/kW/month (Q1 2026, CBRE) (brokerage data). Market vacancy is 0.3%, so 1-5 MW blocks are scarce and typically pre-leased. Total operational inventory is about 4,182 MW.

1-5 MW colocation in Northern Virginia: key numbers

Metric Value Source
Pricing band (market) $190-235/kW/month (Q1 2026, CBRE); $155-185/kW for 10+ MW requirements (CBRE H2 2025); $135-200/kW 1-5 MW (JLL H1 2025)
Vacancy 0.3% CBRE Global Data Center Trends 2026 (Q1 2026); CBRE H2 2025 = 0.5%
Inventory 4,182 MW CBRE Global Data Center Trends 2026 (Q1 2026 data)
Grid PJM

Can Northern Virginia deliver 1-5 MW of power today?

Dominion’s batching system continues to extend power delivery timelines for new projects (CBRE H2 2025); 96% of 2026 scheduled supply already committed, preleasing extending into 2027; hard to secure 15-20 MW contiguous. Available supply only 10.8 MW at Q1 2026 (CBRE).

Which operators can serve 1-5 MW in Northern Virginia?

Operators active in the market at scale include Amazon Web Services, Digital Realty, Equinix, CoreSite, CloudHQ, Vantage, QTS, Microsoft, Google, Iron Mountain, STACK Infrastructure, CyrusOne, Aligned. Availability for a specific block changes monthly; request a capacity check for current options.

What to specify in a 1-5 MW RFP

State IT load in MW and the ramp schedule, target density in kW per rack, redundancy (N+1 or 2N), term, and whether you need liquid cooling. See colocation RFP questions to ask and take-or-pay.

Frequently asked questions

What does 1-5 MW colocation cost in Northern Virginia?

Market pricing bands are $190-235/kW/month (Q1 2026, CBRE); $155-185/kW for 10+ MW requirements (CBRE H2 2025); $135-200/kW 1-5 MW (JLL H1 2025). Larger blocks and longer terms price toward the low end.

Is 1-5 MW capacity available in Northern Virginia right now?

Market vacancy is 0.3%. Blocks of this size are usually committed before completion; lead times run into future delivery phases.

Is Northern Virginia a good market for a 1-5 MW deployment?

Northern Virginia is a Tier 1 market with about 4,182 MW of inventory. Fit depends on power lead time, latency needs and incentive eligibility.

Related pages

Need capacity in Northern Virginia?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Sources

Data compiled by GoDataCenters. Last updated 2026-09-02. Figures are market-level ranges from cited reports, not quotes.




Need capacity?

Send one requirement and we will match it against 4,562 facilities worldwide.

Get a quote