Phoenix Data Center Market

Phoenix data center market 2026: 807 MW inventory, pricing $150-210/kW/month for 1-5 MW, 144 facilities tracked. Operators, power, incentives.

Phoenix is a Tier 1 US data center market in AZ on the WECC grid. Colocation inventory is about 807 MW (CBRE NoVA press release top-10 table (H2 2025): Phoenix 807.3 MW inventory, 10.5 MW available; JLL H1 2025: 904 MW). Typical colocation pricing runs $150-210/kW/month for 1-5 MW (JLL H1 2025). GoDataCenters tracks 144 facilities from 8 operators in the metro.

Phoenix data center market at a glance

Phoenix market statistics, updated 2026-09-02
Metric Value Source
Operational colocation inventory 807 MW CBRE NoVA press release top-10 table (H2 2025): Phoenix 807.3 MW inventory, 10.5 MW available; JLL H1 2025: 904 MW
Under construction 1,700 MW JLL H1 2026 press release: ‘Phoenix absorbed 442 MW amid 1.7 GW under construction’; JLL H1 2025: 1,307 MW; CBRE H2 2025: under construction flat YoY
Planned pipeline 4,154 MW JLL Midyear 2025 (4,154 MW planned; #2 in US) (H1 2025)
Net absorption 442 MW JLL H1 2026 press release (H1 2026 absorption 442 MW); CBRE H2 2025 chapter: 256 MW absorbed across four projects in H2 2025
Typical pricing (kW/month) $150-210/kW/month for 1-5 MW (JLL H1 2025); $170-210/kW (CBRE H1 2024)
Grid operator WECC (non-RTO; APS/SRP balancing authorities)
Power utility Arizona Public Service (APS); Salt River Project (SRP)
Power cost note 7.5 cents/kWh electricity cost cited for Phoenix (AZ Big Media citing JLL Midyear 2025)
Facilities tracked by GoDataCenters 144 GoDataCenters facility database

How available is power for data centers in Phoenix?

SRP and APS power-delivery restrictions are limiting availability of powered land sites; SRP processing its first cluster study of 25 applicants with mixed initial results (CBRE H2 2025). Hobbs energy plan / grid strain a 2026 policy theme.

Power is served by Arizona Public Service (APS); Salt River Project (SRP). Grid operator: WECC (non-RTO; APS/SRP balancing authorities).

Who are the major data center operators in Phoenix?

Major operators active in the market: Microsoft, Aligned, STACK Infrastructure, NTT, CyrusOne, Digital Realty, Iron Mountain, EdgeCore, Vantage, Compass, QTS, Meta (Mesa), Google (Mesa).

Largest operators by facility count in Phoenix
Operator Facilities in metro (GoDataCenters DB)
EdgeCore 17
Compass Datacenters 13
Aligned Data Centers 10
CyrusOne Data Centers 9
NTT DATA, Inc. 8
Prime Data Centers 6
Vantage Data Centers 6
Menlo Digital 6

Facility concentration by city: Phoenix (144).

What does colocation cost in Phoenix?

Typical pricing bands: $150-210/kW/month for 1-5 MW (JLL H1 2025); $170-210/kW (CBRE H1 2024). Bands are brokerage-reported ranges for the market, not quotes. Actual rates depend on power density, term, ramp and redundancy.

What tax incentives apply to data centers in AZ?

Item Detail
State sales/use tax exemption yes (moratorium on new certifications Jul 1 2026 – Jun 30 2029)
Program Arizona Computer Data Center Program (TPT/use tax exemption)
Threshold $50M capital investment within 5 yrs in Maricopa/Pima counties; $25M in other counties; 10 yrs (20 yrs for Sustainable Redevelopment Projects)
Note Three-year moratorium on new program certifications July 1, 2026-June 30, 2029 (compromise after Gov. Hobbs sought full repeal; est. $57M savings) per constructionowners.com 2026 update.

Phoenix colocation by capacity band

Frequently asked questions

How much data center capacity is in Phoenix?

About 807 MW of operational colocation inventory per CBRE NoVA press release top-10 table (H2 2025): Phoenix 807.3 MW inventory, 10.5 MW available; JLL H1 2025: 904 MW. A further 1,700 MW is under construction.

What is the typical colocation price per kW in Phoenix?

$150-210/kW/month for 1-5 MW (JLL H1 2025); $170-210/kW (CBRE H1 2024).

Which grid serves Phoenix data centers?

WECC (non-RTO; APS/SRP balancing authorities). Utility: Arizona Public Service (APS); Salt River Project (SRP).

Does AZ offer a data center sales tax exemption?

yes (moratorium on new certifications Jul 1 2026 – Jun 30 2029). Program: Arizona Computer Data Center Program (TPT/use tax exemption). Threshold: $50M capital investment within 5 yrs in Maricopa/Pima counties; $25M in other counties; 10 yrs (20 yrs for Sustainable Redevelopment Projects).

Is Phoenix a Tier 1, Tier 2 or Tier 3 data center market?

Phoenix is classified as a Tier 1 market, using the CBRE, JLL and Cushman & Wakefield market tracking conventions.

Related pages

Need capacity in Phoenix?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Operate a facility here?

Claim your listing on GoDataCenters to correct specifications and receive the quote requests buyers submit for this market.

Claim your listing

Sources

Data compiled by GoDataCenters. Last updated 2026-09-02. Figures are market-level ranges from cited reports, not quotes.