Reach Data Center Decision MakersAdvertise

Dallas-Fort Worth Data Center Market

Dallas-Fort Worth data center market 2026: 1,249 MW inventory, 1.8% vacancy, pricing $130-170/kW/month for 1-5 MW, 180 facilities tracked. Operators, power, i

Dallas-Fort Worth is a Tier 1 US data center market in TX on the ERCOT grid. Colocation inventory is about 1,249 MW (CBRE Global Data Center Trends 2026 (Q1 2026)). Vacancy is 1.8% (CBRE Global Data Center Trends 2026 (Q1 2026); CBRE H2 2025 = 2.4%). Typical colocation pricing runs $130-170/kW/month for 1-5 MW (JLL H1 2025). GoDataCenters tracks 180 facilities from 39 operators in the metro.

Dallas-Fort Worth data center market at a glance

Dallas-Fort Worth market statistics, updated 2026-09-02
Metric Value Source
Operational colocation inventory 1,249 MW CBRE Global Data Center Trends 2026 (Q1 2026)
Under construction 717 MW CBRE Global Data Center Trends 2026 (Q1 2026), 88% preleased; CBRE H2 2025: ~700 MW, 94.5% preleased
Planned pipeline 3,000 MW CBRE H2 2025 DFW chapter: ‘3 GW of new greenfield development is planned’; JLL H1 2025: 3,870 MW
Vacancy 1.8% CBRE Global Data Center Trends 2026 (Q1 2026); CBRE H2 2025 = 2.4%
Net absorption 471 MW CBRE H2 2025: 470.8 MW net absorption in 2025, up 424 MW YoY (CY2025)
Typical pricing (kW/month) $130-170/kW/month for 1-5 MW (JLL H1 2025); CBRE notes DFW pricing unchanged YoY at Q1 2026
Grid operator ERCOT
Power utility Oncor Electric Delivery (majority); Denton Municipal Electric, Garland Power & Light, CoServ in parts
Facilities tracked by GoDataCenters 180 GoDataCenters facility database

How available is power for data centers in Dallas-Fort Worth?

High demand continued to throttle power delivery; ‘new controls to restrict entry into the power queue’; land inquiries and power requests to the local utility at unprecedented rate; behind-the-meter power solutions being pursued (CBRE H2 2025). Texas directed regulators to make data centers cover grid connection costs (2025-26).

Power is served by Oncor Electric Delivery (majority); Denton Municipal Electric, Garland Power & Light, CoServ in parts. Grid operator: ERCOT.

Who are the major data center operators in Dallas-Fort Worth?

Major operators active in the market: QTS, CyrusOne, Digital Realty, Equinix, Aligned, Compass Datacenters, DataBank, Stream Data Centers, Prime Data Centers, Meta (Fort Worth), Google (Red Oak/Midlothian), Microsoft.

Largest operators by facility count in Dallas-Fort Worth
Operator Facilities in metro (GoDataCenters DB)
Digital Realty 20
Equinix 11
DataBank 10
STACK Infrastructure 10
QTS 10
CyrusOne 7
Lumen 6
Grupo ACS 6
NTT DATA, Inc. 5
IBM 4
Aligned Data Centers 4
Edged Energy 4

Facility concentration by city: Dallas (69), Plano (21), Richardson (18), Fort Worth (16), Lancaster (16), Irving (15), Garland (9), Allen (7), Carrollton (6), Lewisville (3).

What does colocation cost in Dallas-Fort Worth?

Typical pricing bands: $130-170/kW/month for 1-5 MW (JLL H1 2025); CBRE notes DFW pricing unchanged YoY at Q1 2026. Bands are brokerage-reported ranges for the market, not quotes. Actual rates depend on power density, term, ramp and redundancy.

Fiber and carrier presence in Dallas-Fort Worth

Equinix DA campus (Infomart) is the region’s primary carrier hotel (Baxtel).

What tax incentives apply to data centers in TX?

Item Detail
State sales/use tax exemption yes
Program Texas Data Center Sales Tax Exemption (Tax Code 151.359 / 151.3595)
Threshold $200M capital investment over 5 years + 20 qualifying jobs + 100,000 sq ft (10-yr exemption; 15 yrs at $250M+). Large Data Center Project: $500M, 40 jobs, 20 MW transmission contract, 250,000 sq ft, 20-yr state+local exemption. Electricity covered.
Note Governor directed regulators to require data centers to cover grid connection costs; broader incentive review delayed to 2027 session.

Dallas-Fort Worth colocation by capacity band

Frequently asked questions

How much data center capacity is in Dallas-Fort Worth?

About 1,249 MW of operational colocation inventory per CBRE Global Data Center Trends 2026 (Q1 2026). A further 717 MW is under construction.

What is the data center vacancy rate in Dallas-Fort Worth?

1.8% per CBRE Global Data Center Trends 2026 (Q1 2026); CBRE H2 2025 = 2.4%.

What is the typical colocation price per kW in Dallas-Fort Worth?

$130-170/kW/month for 1-5 MW (JLL H1 2025); CBRE notes DFW pricing unchanged YoY at Q1 2026.

Which grid serves Dallas-Fort Worth data centers?

ERCOT. Utility: Oncor Electric Delivery (majority); Denton Municipal Electric, Garland Power & Light, CoServ in parts.

Does TX offer a data center sales tax exemption?

yes. Program: Texas Data Center Sales Tax Exemption (Tax Code 151.359 / 151.3595). Threshold: $200M capital investment over 5 years + 20 qualifying jobs + 100,000 sq ft (10-yr exemption; 15 yrs at $250M+). Large Data Center Project: $500M, 40 jobs, 20 MW transmission contract, 250,000 sq ft, 20-yr state+local exemption. Electricity covered..

Is Dallas-Fort Worth a Tier 1, Tier 2 or Tier 3 data center market?

Dallas-Fort Worth is classified as a Tier 1 market, using the CBRE, JLL and Cushman & Wakefield market tracking conventions.

Related pages

Need capacity in Dallas-Fort Worth?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Operate a facility here?

Claim your listing on GoDataCenters to correct specifications and receive the quote requests buyers submit for this market.

Claim your listing

Sources

Data compiled by GoDataCenters. Last updated 2026-09-02. Figures are market-level ranges from cited reports, not quotes.





Need capacity?

Send one requirement and we will match it against 4,562 facilities worldwide.

Get a quote