Reach Data Center Decision MakersAdvertise

Atlanta Data Center Market

Atlanta data center market 2026: 1,465 MW inventory, 1.0% vacancy, pricing $140-155/kW/month for 1-5 MW, 145 facilities tracked. Operators, power, incentives.

Atlanta is a Tier 1 US data center market in GA on the Southern Company balancing authority grid. Colocation inventory is about 1,465 MW (CBRE Global Data Center Trends 2026 (Q1 2026, +14.5% YoY); CBRE H2 2025: 1,459.2 MW; JLL H1 2025: 1,072 MW). Vacancy is 1.0% (CBRE Global Data Center Trends 2026 (Q1 2026; 14.5 MW available)). Typical colocation pricing runs $140-155/kW/month for 1-5 MW (JLL H1 2025). GoDataCenters tracks 145 facilities from 8 operators in the metro.

Atlanta data center market at a glance

Atlanta market statistics, updated 2026-09-02
Metric Value Source
Operational colocation inventory 1,465 MW CBRE Global Data Center Trends 2026 (Q1 2026, +14.5% YoY); CBRE H2 2025: 1,459.2 MW; JLL H1 2025: 1,072 MW
Under construction 2,076 MW CBRE H2 2025 press release: Atlanta 2,076 MW under construction (-4% YoY); JLL H1 2025: 1,112 MW
Planned pipeline 1,203 MW JLL Midyear 2025 (1,203 MW planned); CBRE H2 2025 chapter cites ‘over 10 GW of future data center expansion’ and ‘over 3 GW of power commitments’ (H1 2025)
Vacancy 1.0% CBRE Global Data Center Trends 2026 (Q1 2026; 14.5 MW available)
Net absorption 918 MW JLL H1 2026 press release: ‘Atlanta hit record absorption of 918 MW in just six months’; 2024 net absorption 705.8 MW (CBRE H2 2024)
Typical pricing (kW/month) $140-155/kW/month for 1-5 MW (JLL H1 2025)
Grid operator Southern Company balancing authority (SERC; non-RTO)
Power utility Georgia Power (Southern Company); EMCs (e.g., Jackson EMC, Walton EMC) in suburbs
Facilities tracked by GoDataCenters 145 GoDataCenters facility database

How available is power for data centers in Atlanta?

Georgia PSC approved new generation capacity for Georgia Power; multiple mega-scale projects coming online at once causing transmission constraints in parts of Georgia; Georgia’s changing regulatory environment creates uncertainty on state tax incentives (CBRE H2 2025). Georgia implemented rules assigning infrastructure costs directly to data centers (DMA 2025).

Power is served by Georgia Power (Southern Company); EMCs (e.g., Jackson EMC, Walton EMC) in suburbs. Grid operator: Southern Company balancing authority (SERC; non-RTO).

Who are the major data center operators in Atlanta?

Major operators active in the market: QTS, Microsoft, Digital Realty (56 Marietta), Equinix, Switch, DataBank, Flexential, Vantage (Douglasville), DC BLOX, AWS, Google, Meta, T5, CyrusOne, EdgeCore, Aligned.

Largest operators by facility count in Atlanta
Operator Facilities in metro (GoDataCenters DB)
QTS Data Centers 22
Bolingbroke Technology Center, LLC 10
Atlas Development LLC 10
T5 Data Centers 7
Lumen 6
DataBank 6
Switch 6
Digital Realty 6

Facility concentration by city: Atlanta (145).

What does colocation cost in Atlanta?

Typical pricing bands: $140-155/kW/month for 1-5 MW (JLL H1 2025). Bands are brokerage-reported ranges for the market, not quotes. Actual rates depend on power density, term, ramp and redundancy.

Fiber and carrier presence in Atlanta

56 Marietta (Digital Realty) carrier hotel is the region’s primary interconnection point (Baxtel).

What tax incentives apply to data centers in GA?

Item Detail
State sales/use tax exemption yes
Program Georgia High-Technology Data Center Equipment sales and use tax exemption
Threshold $15M+ investment (per SDIA/h5datacenters); runs through 2032/2033
Note Repeal effort blocked in 2026 despite ~$2.5B FY2026 cost projection; governor previously vetoed repeal (2024).

Atlanta colocation by capacity band

Frequently asked questions

How much data center capacity is in Atlanta?

About 1,465 MW of operational colocation inventory per CBRE Global Data Center Trends 2026 (Q1 2026, +14.5% YoY); CBRE H2 2025: 1,459.2 MW; JLL H1 2025: 1,072 MW. A further 2,076 MW is under construction.

What is the data center vacancy rate in Atlanta?

1.0% per CBRE Global Data Center Trends 2026 (Q1 2026; 14.5 MW available).

What is the typical colocation price per kW in Atlanta?

$140-155/kW/month for 1-5 MW (JLL H1 2025).

Which grid serves Atlanta data centers?

Southern Company balancing authority (SERC; non-RTO). Utility: Georgia Power (Southern Company); EMCs (e.g., Jackson EMC, Walton EMC) in suburbs.

Does GA offer a data center sales tax exemption?

yes. Program: Georgia High-Technology Data Center Equipment sales and use tax exemption. Threshold: $15M+ investment (per SDIA/h5datacenters); runs through 2032/2033.

Is Atlanta a Tier 1, Tier 2 or Tier 3 data center market?

Atlanta is classified as a Tier 1 market, using the CBRE, JLL and Cushman & Wakefield market tracking conventions.

Related pages

Need capacity in Atlanta?

Tell us the MW, timing and density. We match requirements to operators with live availability, at no cost to the buyer.

Find capacity

Operate a facility here?

Claim your listing on GoDataCenters to correct specifications and receive the quote requests buyers submit for this market.

Claim your listing

Sources

Data compiled by GoDataCenters. Last updated 2026-09-02. Figures are market-level ranges from cited reports, not quotes.





Need capacity?

Send one requirement and we will match it against 4,562 facilities worldwide.

Get a quote